Klondike Silver’s Rock Quarry located along the 4000’ Level Adit access road is producing rock necessary for armouring the West Bank of Carpenter Creek adjacent to Klondike’s Tailings Management Facility. Klondike’s Silvana Mine Silver Zinc Lead project is located in South Eastern B.C., 138 km north of the Trail B.C. smelter. Klondike Silver is exploring from underground, the western extension of the Silvana Mine, along the “Main Lode”. The “Main Lode” is a 9 km vein structure which is the most prolific mineralized structure in the Slocan Mining Camp. There are 13 historical mines that are situated along the 9 km vein structure which have produced 886,000 kg of silver, 95 million kg of zinc and 117 million kg lead so far. Including 8 of the 13 above there are 68 historical mines that are situated in the Klondike Silver 116 square kilometer claim block which have produced 1,258,000 kg of silver, 72 million kg of zinc and 158 million kg lead so far.