Talisker Resources Ltd. announced additional high-grade drill results highlighted by 86.50 g/t Au over 1.50 metres within a broader interval of 14.31 g/t over 9.55 metres at its 100% owned Bralorne Gold Project. Talisker initiated resource conversion drilling on October 17, 2023 with 15,000 metres of planned drilling. Hole SB-2023-016 intersected 86.50 g/t Au over 1.50 metres within a broader interval of 14.31 g/t Au over 9.55 metres on the BK-9870 Vein.

Hole SB-2023-016 also intersected 21.86 g/t Au over 3.00 metres on the BK Vein. Hole SB-2023-031 intersected 8.53 g/t Au over 3.50 metres on the BK-9870 vein. To date, a total of 73 holes have been drilled during the infill drill program with 13,231 metres completed.

The resource conversion drill program is focused on increasing confidence in the Alhambra and BK Vein. SB-2023-016 Description: All assays have been received. Located in King block and hosted in diorite intrusive.

Intersected the BK-9870 vein from 291.30 - 292.80 metres. Intersected the BK vein from 323.00 ? 326.00 metres.

SB-2023-031 Description: All assays have been received. Located in King block and hosted in diorite intrusive. Intersected the BK-9870 vein from 49.50 ?

54.50 metres. Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization.

Alteration halos consist of strong silica-sericite±mariposite alteration halos.