Talisker Resources Ltd. announced additional high-grade drill results highlighted by 24.41 g/t Au over 1.50 metres within a broader interval of 7.33 g/t over 5.70 metres at its 100% owned Bralorne Gold Project. Key Points: Talisker initiated resource conversion drilling on October 17, 2023 with 15,000 metres of planned drilling. Hole SB-2023-030A intersected 24.41 g/t Au over 1.50 metres within a broader interval of 7.33 g/t Au over 5.70 metres on the BK-9870 Vein.

Hole SB-2023-030A also intersected 10.40 g/t Au over 0.80 metres within a broader interval of 5.51 g/t Au over 3.00 metres on the Alhambra Vein. Hole SB-2023-026 intersected 18.93 g/t Au over 1.00 metres within a broader interval of 6.49 g/t over 4.95 metres on the BK-9870 Vein. The resource conversion drill program is focused on increasing confidence in the Alhambra, BK-9870 and BK Vein.

A total of 81 drill holes were drilled during the resource conversion program, totaling 14,949 metres. All 2023 assays have been received. Currently, there are 2,157 samples from the 2024 First Quarter drilling program at the assay laboratory awaiting to be received.

SB-2023-026 Description: All assays have been received. Located in the King block and hosted in diorite intrusive. Intersected the BK-9870 vein from 51.70 - 57.00 m. SB-2023-030A Description: All assays have been received.

Located in the King block and hosted in diorite intrusive. Intersected the BK-9870 vein from 62.90 - 63.50 m. Intersected the Alhambra vein from 159.75 - 160.35 m Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization.

Alteration halos consist of strong silica-sericite±mariposite alteration halos.