Talisker Resources Ltd. announce additional high-grade drill results highlighted by 80.68 g/t Au over 2.20 metres within a broader interval of 28.58 g/t over 6.35 metres at its 100% owned Bralorne Gold Project. SB-2023-012 Description, Complete results received. Located in the King block and intersected dioritic intrusive.

BK Vein intersected from 265.25 to 267.25m as a banded brecciated quartz vein hosting arsenopyrite and pyrite mineralization. B-2023-023 Description Complete results received. Located in the King block and intersected dioritic intrusive.

BK Vein intersected from 296.15 to 297.85m as a banded brecciated quartz vein hosting arsenopyrite and pyrite mineralization with moderate hanging wall mariposite alteration. Alhambra Vein intersected from 320.05 to 321.60m as a banded brecciated quartz vein hosting arsenopyrite and pyrite mineralization and moderate silica/mariposite alteration. Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae.

Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.