Northern Data AG announced production results for the August and year to date 2022. Ethereum production in August 2022: 3,875. 223,000 connected GPU cards with maximum available computing power of 12.7 terahash per second (TH/s) of which 8.74 TH/s were online (as of end of August); 3,875 ETH were sold at an average price of EUR 1,692/ETH, generating cash of EUR 6.6 million. Bitcoin production in August 2022: 216 (+5% month-on-month). 33,600 connected ASIC systems with a maximum available computing power of 3.08 exahash per second (EH/s) of which 20,300 were online with a hashrate of 1.81 (as of end of August) 434 BTC were sold at an average price of 21,761 EUR/BTC, generating EUR 9.4 million in cash.
Mining production since the beginning of 2022- 2,014 Bitcoin (average of 252 BTC/month); 37,446 Ethereum (average of 4,681 ETH/month).