Group Eleven Resources Corp. provided a drill progress update and announce the addition of a second drill rig at the Ballywire Zn-Pb-Ag-Ge discovery ("Ballywire"), PG West Project ("PG West", 100%-interest), Ireland. Drill Update at Ballywire: Two drill holes have been completed (G11-468-09 and -12), totaling 375m and 323m, respectively; results are to be announced over the coming weeks upon completion of assays expected in due course; G11-468-09 was a 375m continuation (to a total depth of 546m) of a previous hole drilled by Group Eleven, which had been stopped at 171m.

G11-468-12 was an 80m step-out to the east (along strike) of G11-468-06 (which intersected 6.0m of 8.6% Zn and 3.8% Pb, or 12.4% Zn+Pb, and 68 g/t Ag; see news release dated 02-Mar-2023); Two drill rigs are now in operation, with the second rig added last week; The Company is currently drilling hole G11-468-13 (stepping 50m north and up-dip of G11-468-12) and G11-3552-02 (stepping 150m south and downdip of G11-468 -12). Results from the above holes will be released in due course.