Quarterly Report for March 2022

Highlights

  • During the quarter Rand and Tribune processed 84,733 tonnes of ore at 3.68 g/t from the EKJV operations at the joint venture partner Evolution Mining Limited Mungari processing plant, with Tribune's share equating to 63,550 tonnes.

  • 9,407 ounces of gold were produced by Rand and Tribune during the quarter with Tribune's 75% share equating to 7,056 oz

  • Significant high grade intercepts from drilling at the EKJV project including results from the Mary fault of 3.3 m @ 7.7 g/t, 4.1m @ 4.4 g/t, and 0.5 m @ 17.1 g/t gold.

  • Assay results from the recent drilling campaign at Seven Mile Hill project show potential for a mineralised sulphide gold system

Suite G1, 49 Melville Parade South Perth WA 6151 T: +61 8 9474 2113 | F: +61 8 9367 9386

E:tribune@tribune.com.au| W: www.tribune.com.au

Ore Stockpiles

At the end of the quarter Tribune was entitled to a share of the following stockpiles -

STOCKPILES

ROM Pad

Ore Source

Ore Tonnes

Grade g/t

Ounces

Au

Tribune Entitlement

EKJV Stockpiles

Rubicon ROM

EKJV RHP Ore

15983

3.74

1923

36.75%

Rubicon ROM

EKJV RHP Low Grade

4,780

1.35

207

36.75%

Mungari ROM

EKJV RPH Ore

2,759

3.68

326

36.75%

Tribune Share of EKJV Stockpiles

8,644

3.25

903

100%

Geology and Mining

EAST KUNDANA JOINT VENTURE

Raleigh Underground Mine Production

Raleigh remained on care and maintenance throughout the quarter.

Raleigh Underground Mine Development

At the end of the quarter, the bottom of the Raleigh Decline remains at 5602 m RL, 743 m from the surface, the top of the Sadler Incline remains at 5989 m RL, 356 m from the surface and the bottom of the Sadler Decline remains at 5944 m RL, 401 m from the surface.

There was no development during the quarter.

Rubicon-Hornet-Pegasus Underground Mine Production

Contained gold in stope and development ore mined during the quarter is tabulated below:

ORE BODY

Rubicon, Hornet & Pegasus

Month

Tonnes

Grade

Ounces

January

40,441

2.63

3,417

February

34,686

3.40

3,797

March

43,637

4.30

6,038

March 2022 Q

118,764

3.47

13,252

December 2021 Q

101,292

3.94

12,841

Tribune's Mine Production Entitlement (36.75%)

Rubicon, Hornet & Pegasus

Quarter

Ore

Grade

Ounces

Tonnes

g/t

troy oz

December 2021 Q

37,225

3.94

3,115

March 2022 Q

43,646

3.47

4,870

TRIBUNE RESOURCES LTD (ASX:TBR) | ASX ANNOUNCEMENT Quarterly Report for March 2022

Rubicon-Hornet-Pegasus Underground Mine Development

Development performance for the quarter is summarised in the following table.

ORE BODY

Rubicon, Hornet & Pegasus

Month

Capital

Decline

Other

Ore

Waste

Paste

(m)

(m)

(m)

(m)

(m)

January

35.0

52.2

76.5

34.5

31.2

February

41.3

79.6

94.9

8.6

53.0

March

48.5

85.0

95.4

0.0

28.5

March 2022 Q

124.8

216.8

266.8

43.1

112.7

Toll Processing

Operating Lateral development

During the quarter a total of 84,733 tonnes of Rand and Tribune ore at 3.68 g/t was processed at the Mungari processing plant under the EKJV joint venture agreement with Evolution Mining Limited to recover 9,407 oz of gold at 93.86% gold recovery.

Rand and Tribune gold production for the March 2022 quarter, along with Tribune's share is tabulated below.

Rand and Tribune Ore Processed

Campaign Location

Tonnes Milled

Head GradeAu

(g/t)

Recovery (%)

Fine Au Produced

(Oz)

EVN Mungari

84,733

3.68

93.86%

9,407

Tribune Share of Ore Processed

Campaign Location

Tonnes Milled

Head GradeAu

(g/t)

Recovery (%)

Fine Au Produced

(Oz)

EVN Mungari

63,550

3.68

93.86%

7,056

EKJV Underground Exploration

Mineralisation intersected by drilling in the Mary Fault at the Rubicon/Hornet/Pegasus (RHP) underground is hosted by a 0.5 to 4.0m wide quartz-breccia.

Significant drilling intercepts returned during the March quarter include:

  • 3.30m (2.70m etw) grading 7.70g/t gold from 89.3m (STKD21026)

  • 4.10m (4.10m etw) grading 4.40g/t gold from 149.0m (STKD22002)

  • 0.50m (0.5m etw) grading 17.10g/t gold from 168.9m (STKD21018)

Assays are pending for three holes into the Mary Fault. If results are considered positive, further step-out drilling will continue with the aim of delineating a new potential resource opportunity at RHP.

Plan view of the significant results received for Mary Fault drilling during the March quarter

Full details of all EKJV exploration activities including significant intersections from results received are contained in the 2022 Quarter 3 EKJV Exploration Report, released to the ASX on 28 April 2022.

Other Exploration Projects

Tribune Resources (Ghana) Limited (Tribune's Interest 100%)

There were no drilling activities or assays received during the quarter. Working with external consultants, an extensive database review was conducted that identified additional drilling targets within the concession. Planning for additional drilling is underway with the objective of increasing the confidence of the 1.8 million ounce Adiembra mineral resource.

With the relaxation of travel restrictions in place due to the Covid pandemic, Tribune personnel from Australia arrived on site late in the quarter to progress activities on site during the next period.

The proposed work program for the next quarter includes a UAV aerial topographic survey and ground truthing for the concession area, planning and execution of infill drilling and extension of known areas ofmineralisation to upgrade the mineral resource, and planning of test hole drilling for the project to assist with metallurgical, geotechnical, hydrology and future location of site infrastructure.

Diwalwal Gold Project (Philippines) (Tribune's Legal Interest 40% and a further 20% earnt Economic Interest)

Hole

MGA N

MGA E

RL

Depth

Dip

Az

From

To

m

Au (g/t)

TBRC081

6583146

348602

341

198

-60

90

63

64

1

1.29

TBRC082

6583053

348799

341

173

-60

90

66

68

2

1.11

and

144

145

1

1.54

and

160

161

1

1.36

and

170

172

2

2.12

TBRC084

6582959

348769

341

184

-60

90

124

125

1

1.42

and

135

136

1

1.41

During the quarter in the Upper Ulip tenement, surface exploration work was conducted in the Paraiso (Lantawan and Rockstar prospects). Twelve (12) rock and a panned concentrate samples were collected for chemical analysis.

The samples were taken from several small-scale mines (SSM) that are operating in Lantawan

Surface exploration was conducted west of the 729 ha tenement to identify potential extension of Diwalwal veins. Twenty-four (24) rock samples were collected for chemical analysis.

Victory tunnel operations include regular inspection and maintenance activities for tunnel stability and safety inspections.

Tree nursery and materials recovery operations carried on throughout the quarter, ensuring efforts to protect the environment are in place.

No drilling or assay results were conducted during the quarter.

Seven Mile Hill Joint Venture (Tribune's Interest 50%)

During the quarter, all 4m composite assays were received for the most recent RC drilling program. Three holes intersected significant (+0.5g/t Au) values. These are shown in the table below.

Anomalous (+0.5g/t Au) values from RC and RC precollar holes at 7MH - 4m composites.

Hole

N

E

RL

RC M

DD M

Total Depth

Dip

AZ

From

To

m

g/t Au

TBRC086

348854

6582858

340

143.0

0

143.0

-60

90

56

60

4

1.06

TBRD089

349151

6582961

340

89.5

91.9

181.5

-60

90

28

32

4

3.66

TBRD090

349085

6582963

340

97.6

111.5

209.1

-60

90

56

60

4

0.55

Individual 1m samples for the RC holes with anomalous values have been submitted to the lab and results for approximately half have been received with the results in the table below. The remainder of the results are expected in the next quarter.

Anomalous (+1g/t Au) values from RC holes at 7MH - 1m splits.

This is an excerpt of the original content. To continue reading it, access the original document here.