Hole V-23-061 returned 2.46 g/t Au over 519.6 m from surface, including 3.60 g/t Au over 265.6 m downhole, demonstrating a strong consistency of near-surface, multiple-gram-per-tonne-gold mineralization. Holes V-23-059 and V-23-060 were drilled within the southeast extension of the system and add dimensionality and consistency to known mineralization in that direction. Assays for more than 5,475 m of diamond drilling from
'The Valley discovery on our 100%-owned, district-scale
HOLE V-23-061
Hole V-23-061 is collared in coarse-grained granodiorite within the Valley intrusion roughly 60 m northeast of V-22-039 (553.8 m @ 2.48 g/t Au including 183.3 m @ 4.34 g/t Au from surface, see
The hole commences in strong, sheeted gold-bearing quartz vein mineralization from bedrock surface at 5.5 m downhole and continues in strong mineralization until approximately 270 m downhole, where the hole intersects a central, valley-parallel fault. Quartz vein densities drop off below the fault, but lower grade mineralization continues for the remainder of the hole. Vein orientations in the lower part of the hole generally run at low angles to the drill core, whereas in the upper part of the hole they are consistent with the dominant, steeply dipping northwest striking vein array seen across the Valley intrusion.
Overall, the top 519.6 m downhole from bedrock surface average 2.46 g/t Au, with an internal interval of 265.6 m averaging 3.60 g/t Au also beginning from surface. This sub interval is the strongest near-surface (upper 250 vertical metres from bedrock surface) mineralized intersection from the Valley target to date. Within this, a zone of sustained higher grades beginning at 149.0 m downhole averages 6.47 g/t Au over 47.5 m.
Within the top 265.6 m interval downhole from bedrock surface, 90% of assays (measured by core length) returned >1 g/t Au and no assays returned
(C) 2023 Electronic News Publishing, source