TECHNICAL REPORT SUMMARY OF

THE SIBANYE-STILLWATER US PGM OPERATIONS

SITUATED IN THE

MONTANA, UNITED STATES

Report Date: 13 December 2023

Effective Date: 31 December 2021

Prepared by:

Qualified Persons at Sibanye-Stillwater US PGM Operations

Important Notices

Description of Amendments to Previously Filed Technical Report Summary

This Technical Report Summary (TRS) for the US PGM Operations of Sibanye-Stillwater Limited (Sibanye- Stillwater) (the Sibanye-StillwaterUS PGM Operations), dated 13 December 2023, serves as an amendment to the TRS prepared by the Qualified Persons at Sibanye-Stillwater for the fiscal year ended 31 December 2021, effective 31 December 2021, which was filed as Exhibit 96.1 to Sibanye- Stillwater's 2021 annual report filed on Form 20-F on 22 April 2022 (the Original 2021 Sibanye-StillwaterUS PGM Operations TRS) and incorporated by reference into Sibanye-Stillwater's 2022 annual report filed on Form 20-F on 24 April 2023.

This TRS was prepared by the Qualified Persons at Sibanye-Stillwater following the receipt of comment letters by Sibanye-Stillwater and associated dialogue with the staff (the Staff) of the United States Securities and Exchange Commission (the SEC) regarding information in the Original 2021 Sibanye- Stillwater US PGM Operations TRS. While this TRS incorporates certain changes to the Original 2021 Sibanye-Stillwater US PGM Operations TRS, it maintains an effective date of 31 December 2021 with regard to assumptions and the knowledge of the Qualified Persons at Sibanye-Stillwater. This TRS revises the following information in the Original 2021 Sibanye-Stillwater US PGM Operations TRS as a result of the comments received from the Staff:

  • Revisions to the abridged cash flow results table on page [253] (Table 63) to include the particularized disclosure requirements of Item 601(b)(96)(iii)(B)(19) of Regulation S-K in one table, including annual production for the life of the project and the associated revenue, operating and capital costs, taxes, and royalties.

ii

Table of Contents

EXECUTIVE SUMMARY

1

Introduction

1

Property Description, Mineral Rights and Ownership

1

Geology and Mineralisation

2

Exploration Status, Development and Operations and Mineral Resource Estimates

2

Mining Methods, Ore Processing, Infrastructure and Mineral Reserve Estimates

4

Capital and Operating Cost Estimates and Economic Analysis

7

Permitting Requirements

8

Conclusions and Recommendations

8

INTRODUCTION

9

Registrant

9

Compliance

9

Terms of Reference and Purpose of the Technical Report

9

Sources of Information

10

Site Inspection by Qualified Persons

11

Units, Currencies and Survey Coordinate System

11

RELIANCE ON INFORMATION PROVIDED BY REGISTRANT

12

PROPERTY DESCRIPTION

14

Location and Operations Overview

14

Mineral Title

15

Title Overview

15

Title and Tenure Held

15

Title and Tenure Conditions and Compliance

17

Surface Rights and Servitudes

18

Royalties

20

Legal Proceedings and Significant Encumbrances to the Property

20

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

22

Topography and Elevation

22

Stillwater Mine and the Hertzler Tailing Storage Facility

22

East Boulder Mine

22

Fauna and Flora

22

Access, Towns and Regional Infrastructure

23

Climate

23

Infrastructure and Bulk Service Supplies

24

iii

Personnel Sources

25

HISTORY

26

Ownership History

26

Previous Exploration and Mine Development

27

Previous Exploration

27

Mine Development

28

Plant, Property and Equipment

29

ADJACENT PROPERTIES

31

GEOLOGICAL SETTING, MINERALISATION AND DEPOSIT

32

Regional Geology

32

Local and Property Geology

35

Local Stratigraphy

35

J-M Reef Mineralisation

37

EXPLORATION

44

Data Acquisition Overview

44

Gravity Surveys

44

Aeromagnetic Surveys

44

Topographic Surveys

45

Exploration and Mineral Resource Evaluation Drilling

45

Drilling

45

Core Logging and Reef Delineation

50

Survey Data

50

Density Determination

52

Underground Mapping

52

Hydrogeological Drilling and Testwork

53

Stillwater Mine

53

East Boulder Mine

56

Geotechnical Data, Testing and Analysis

58

Geotechnical Characterisation

58

Geotechnical Testwork and Data Collection

58

Geotechnical Results and Interpretation

60

SAMPLE PREPARATION, ANALYSES AND SECURITY

62

Sampling Governance and Quality Assurance

62

Reef Sampling

63

Sample Preparation and Analysis

63

Laboratory

63

iv

Sample Preparation and Analysis

64

Analytical Quality Control

65

Nature and Extent of Quality Control Procedures

65

Quality Control Results

66

DATA VERIFICATION

71

Data Storage and Database Management

71

Database Verification

71

MINERAL PROCESSING AND METALLURGICAL TESTING

73

Metallurgical Testwork and Amenability

73

Deleterious Elements

73

MINERAL RESOURCE ESTIMATES

74

Background

74

Geological Modelling and Interpretation

74

Zone Picking and Evaluation Cut Determination

74

Data Processing and Analysis

75

Structural Modelling and Geological Loss Determination

81

Geological Interpretation and Wireframe Modelling

81

Block Modelling

86

Grade and Tonnage Estimation

86

Grade and Thickness Estimation

86

Block Model Validation

90

Tonnage Estimation

92

Mineral Resource Classification

92

Cut-off Grades, Technical Factors and Reasonable Prospects for Economic Extraction

93

Prospects for Eventual Economic Extraction Assessment

93

Cut-off Grades and Minimum Mining Width

94

Mineral Resource Estimates

96

MINERAL RESERVE ESTIMATES

98

Mineral Resource to Mine Reserve Conversion Methodology

98

Mineral Resources Available for Conversion

98

Mineral Reserve Estimation Methodology

98

Point of Reference

100

Cut-off Grades

100

Mineral Reserve Classification Criteria

101

Mineral Reserve Estimates

104

Risk Assessments

105

v

MINING METHODS

107

Introduction

107

Mine Design

107

Mining Method Rationale

107

Ramp and Fill Method

108

Captive Cut and Fill Method

109

Sub-level Extraction and Sub-level Development

109

Transverse Long Hole Stoping

110

Stope Extraction Ratios

111

Hydrogeological Model

111

Stillwater Mine

111

East Boulder Mine

112

Geotechnical Model

112

Geotechnical Characterisation

112

Support Design

113

Surface and Subsidence Control

114

Backfill

114

Stillwater Mine Operations

115

Background

115

Key Operational Infrastructure

116

Mine Layout

116

East Boulder Mine Operations

117

Background

117

Key Operational Infrastructure

117

Mine Layout

118

Life of Mine Planning and Budgeting

120

Introduction

120

Mine Planning Criteria

120

Modifying Factors

122

Indicated Mineral Resources to Probable Mineral Reserves Conversion Factors

124

Life of Mine Production Scheduling and Budgeting

125

Process Overview

125

LoM Production Schedule for Stillwater Mine

126

Life of Mine Production Schedule for East Boulder Mine

128

Mining Equipment

129

Stillwater Mine

129

East Boulder Mine

130

Logistics

131

Stillwater Mine

131

East Boulder Mine

132

Underground Mine Services

133

Stillwater Mine

133

vi

East Boulder Mine

136

Manpower

140

PROCESSING AND RECOVERY

143

Mineral Processing Methods

143

Background

143

Ore Processing

143

Stillwater Concentrator

143

East Boulder Concentrator

147

Concentrator Process Control Sampling

151

Smelting and Refining

152

Background

152

Smelter

152

Base Metal Refinery

157

PGM Prill Splits

161

Processing Logistics

161

INFRASTRUCTURE

163

Stillwater Mine Complex

163

Concentrator Infrastructure

163

Tailings Storage Facilities

163

Power

166

Bulk Water

167

Roads

168

Equipment Maintenance

168

Buildings

169

Transportation

171

East Boulder Mine Complex

172

Concentrator Infrastructure

172

Tailings Storage Facilities

172

Power

174

Bulk Water

174

Roads

176

Buildings

176

Equipment Maintenance

177

Transportation

178

Dry Fork Waste Rock Storage Area

178

Columbus Metallurgical Facility

178

MARKET STUDIES

180

Introduction

180

vii

PGM Market Overview

180

Platinum and Palladium Demand and Supply

181

Demand Drivers

181

Platinum

181

Palladium

181

Palladium and Platinum Pricing Outlook

181

Metals Marketing Agreements

182

The Columbus Metallurgical Complex

182

Precious Metals Refining

182

Wheaton International Streaming Agreement

182

The 2020 Palladium Hedge

183

ENVIRONMENTAL STUDIES, PERMITTING, PLANS, NEGOTIATIONS/AGREEMENTS

184

Social and Community Agreements

184

Environmental Studies, Permitting and Plans

185

Overview of Environmental Legislation and Regulation

185

Environmental Setting and Factors

190

Environmental Studies

190

Permitting Status and Compliance

194

Requirements for Environmental Monitoring, Closure and Post Closure, and Management

Plans

220

Reclamation Plans and Costs

229

CAPITAL AND OPERATING COSTS

235

Overview

235

Capital Costs

235

Background

235

Stillwater Mine

235

East Boulder Mine

239

Columbus Metallurgical Complex

242

Operating Costs

244

Background

244

Stillwater Mine

244

East Boulder Mine

245

Columbus Metallurgical Complex

246

ECONOMIC ANALYSIS

251

Background

251

Economic Viability Testing Method

251

Economic Assumptions and Forecasts

252

Taxation

252

viii

Metal Price Forecast

252

Discount Rate

252

DCF Results and Sensitivity Analysis

252

DCF Model

252

Net Present Values

256

Internal Rate of Return

256

Sensitivity Analysis

256

OTHER RELEVANT DATA AND INFORMATION

258

Catalytic Converter Recycling Business

258

Background

258

Recycle Processing

258

Recycling Operations

259

INTEPRETATION AND CONCLUSIONS

260

RECOMMENDATIONS

264

QUALIFIED PERSONS' CONSENT AND SIGN-OFF

265

REFERENCES

266

List of Figures

Figure 1:

Location of Sibanye-Stillwater US PGM Operations in Montana

14

Figure 2:

Sibanye-Stillwater US PGM Operations Mineral Title and Tenure Map

19

Figure 3:

Regional Geology of the Stillwater Complex and Surrounds

33

Figure 4:

South to North Sections Through Stillwater Mine Showing Subsurface Geology

34

Figure 5:

A Schematic Section through Stillwater Mine Depicting the Horseman Thrust

System

34

Figure 6:

General Stratigraphy of the Stillwater Complex

36

Figure 7:

Typical Stratigraphic Sequence and Pd-Pt Grade Profiles of the J-M Reef

39

Figure 8:

West to East Schematic Section Showing Variability in Stratigraphy and Impact

on the J-M Reef at Stillwater Mine

41

Figure 9:

West to East Section Showing Geological Blocks of the J-M Reef at Stillwater Mine

........................................................................................................................................

42

Figure 10: West to East Section Showing Geological Blocks of the J-M Reef at East Boulder

Mine

43

Figure 11: Underground Definition Diamond Drilling Pattern

46

Figure 12: Drillhole Layout for Stillwater Mine

48

Figure 13: Drillhole Layout for East Boulder Mine

49

ix

Figure 14: Sub-surface Water Basin in the Stillwater East Mine Area

54

Figure 15: Hydrogeological Drillhole Locations along Adits in the Stillwater East Section

55

Figure 16: Average Water Inflow at East Boulder Mine

57

Figure 17: Test Sites for In Situ stress Measurements at Stillwater Mine

59

Figure 18: Test Sites for In Situ Stress Measurements at East Boulder Mine

60

Figure 19: Repeat Data Analysis for Stillwater Mine

67

Figure 20: Repeat Sample Data Analysis for East Boulder Mine

67

Figure 21: Blank Sample Data Analysis for Stillwater and East Boulder Mines

68

Figure 22: Laboratory Standard MF-14 Data Analysis

69

Figure 23: Laboratory Standard MF-15 Data Analysis

69

Figure 24: Laboratory Standard MF-16 Data Analysis

69

Figure 25: Laboratory Standard MF-18 Data Analysis

70

Figure 26: Laboratory Standard MF-20 Data Analysis

70

Figure 27: Laboratory Standard MF-21 Data Analysis

70

Figure 28: Scatter plot of Composite UHW vs. 2E Grade for Stillwater Mine

77

Figure 29: Scatter plot of Composite UHW vs. 2E Grade for East Boulder Mine

77

Figure 30: Histogram Plot of Composite 2E Grades for Stillwater Mine

78

Figure 31: Histogram Plot of Composite 2E Grades for East Boulder Mine

78

Figure 32: Spatial Analysis of FCW Continuity

80

Figure 33: Illustration of Reef Channel Wireframe Model Terminated at a Fault at Stillwater

Mine

82

Figure 34: Illustration of Reef Channel Wireframe Model Terminated at Dykes at East Boulder

Mine

83

Figure 35: J-M Reef Geological and Structural Models for Stillwater Mine

84

Figure 36: J-M Reef Geological and Structural Models for East Boulder Mine

85

Figure 37: Modelled 2E Grades and Classification for Stillwater Mine

88

Figure 38: Modelled 2E Grades and Classification for East Boulder Mine

89

Figure 39: Blitz Mean 2E Grade (opt) by Easting

91

Figure 40: Frog Pond East Mean 2E Grade (opt) by Easting

91

Figure 41: Mineral Reserve classification for Stillwater Mine

102

Figure 42: Mineral Reserve classification for East Boulder Mine

103

Figure 43: Overhand and Underhand Ramp and Fill Mining Methods

108

Figure 44: Sub-level Extraction (Longitudinal) Long Hole Open Stoping

109

Figure 45: Transverse Long Hole Open Stoping

110

Figure 46: Generalized Underground Layouts for Stillwater and East Boulder Mines

119

Figure 47: Typical Ramp and Fill Stope Design

122

Figure 48: LoM RoM ore production schedule for Stillwater Mine

127

Figure 49: LoM Production Schedule for East Boulder Mine

129

Figure 50: Stillwater Mine Compressed Air Service Map

135

x

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Sibanye Stillwater Limited published this content on 13 December 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 24 December 2023 17:33:44 UTC.