In January-February 2024, volume of oil transportation from Tengiz field towards Baku-Tbilisi-Ceyhan oil pipeline amounted to 232 th. tons
15.03.24 11:21
/KASE, March 15, 2024/ - KazTransOil JSC (Astana), whose shares are officially listed on Kazakhstan Stock Exchange (KASE), has provided KASE with the following press release dated March 15, 2024: quote In January-February 2024, KazTransOil JSC shipped Kazakh oil from the Tengiz field in the direction of the Baku-Tbilisi-Ceyhan oil pipeline in the amount of 232 thousand tons. During this period, 331 thousand tons of oil were shipped from the port of Aktau towards the port of Makhachkala. At the end of 2023, the loading of oil into tankers in the port of Aktau using the facilities of KazTransOil JSC amounted to 3 million 376 thousand tons, including 1 million 057 thousand tons in the Baku-Tbilisi-Ceyhan direction. In 2022, the President of the Republic of Kazakhstan Kassym-Jomart Tokayev ordered to increase the volume of oil transportation along the Trans-Caspian corridor. In accordance with this instruction, JSC NC KazMunayGas and the state oil company of the Republic of Azerbaijan SOCAR entered into an agreement providing for the transportation of up to 1.5 million tons of oil per year from the Tengiz field in the direction of the Baku-Tbilisi-Ceyhan oil pipeline. unquote The complete press release is available on: - https://kase.kz/files/emitters/KZTO/kzto_reliz_150324_kz.pdf - in Kazakh; - https://kase.kz/files/emitters/KZTO/kzto_relizs_150324.pdf - in Russian; - https://kase.kz/files/emitters/KZTO/kzto_reliz_150324_en.pdf - in English. [2024-03-15]

Attachments

  • Original Link
  • Permalink

Disclaimer

Sberbank of Russia published this content on 15 March 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 March 2024 06:57:02 UTC.