Marvel Discovery Corp. announced that the Company is planning a till sampling exploration program at its Victoria Lake Property for Second Quarter 2024. The project is being planned as a follow-up to reconnaissance till and soil sampling completed in 2023 that identified anomalous gold.

The Victoria Lake Property is situated over more than 15 kilometres of the Victoria Lake Shear Zone (VLSZ), part of an extensive fault corridor within Central Newfoundland that Honsberger et al. (2022) identified as emerging as one of the most prospective orogenic gold domains in Atlantic Canada. The project will further follow up on the second highest regional gold-in-till sample identified by the Newfoundland Geoscience Atlas, which reported 785 ppb Au from a sample collected within Marvel's Victoria Lake project.

Results from Marvel's spring 2023 program were reported on August 14, 2023. The 2023 exploration program conducted till sampling over two geological targets as part of the Company's investigation of the potential for structures associated with the Cape Ray Fault - Victoria Lake Shear Zone corridor. Marvel plans to complete an enhanced program of till sampling over the area in late spring-early summer 2024 and will follow up with additional sampling in areas where anomalous gold was identified.

The second highest regional gold-in-till sample in the Newfoundland Geoscience Atlas database which reported 785 ppb Au was collected from within Marvel's Victoria Lake project, and the north survey grid for 2024 is intended to follow up on this historic high-grade anomaly. The Cape Ray Fault is an extensive fault corridor that is well recognized as being highly fertile for structural gold mineralization and is host to well-known gold occurrences that include the Cape Ray Deposit, the Valentine Gold Deposit, and the Wilding Lake Prospect. Marvel's Victoria Lake Property represents one of the largest land packages on strike and contiguous to Calibre Mining Corp.'s ("Calibre") Valentine Gold Project.

The recent purchase of Marathon by Calibre (Calibre Mining Completes Acquisition of Marathon Gold - Junior Mining Network) marked a significant milestone for this entire area with their intention for an accelerated mine development phase. The Valentine Gold Project is anticipated to contribute an expected annual gold production of 195,000 ounces at a cost of USD 1,007 per ounce during the first 12 years of production starting in 2025. The Valentine Lake shear zone plays a pivotal role in hosting gold mineralization within this entire camp with ongoing exploration and studies providing a greater understanding of this regional scale structure.

Marvel's detailed studies of this area have demonstrated the potential for the continuation of this major structure to continue across the Victoria Lake Property.