The board of directors (the "Board") of CNMC Goldmine Holdings Limited (the "Company" and together with its subsidiaries, the "Group") would like to provide an update on the construction of the flotation plant at Sokor, the lynchpin of the Group's planned diversification into the production and sale of non-gold base metals comprising lead and zinc. The construction and installation of the aforesaid flotation plant, which will be able to process about 550 tonnes of ore daily, has been completed. The engineers and technicians currently on-site are conducting individual equipment as well as combined system testing, in preparation for a trial production run. The Group will make an announcement to notify shareholders when the flotation plant enters into trial production.