CGE Energy has delivered their complete and improved WIND e20 wind turbine design to the engineering team at Burtek Enterprises, CGE Energy's strategic manufacturing and assembly partner. This collection of intellectual property includes the extensive computer generated data package and complete bill of materials. With the original turbine concept unveiled on 7/31/12, WIND e20 is CGE Energy's exclusive and patented vertical axis wind turbine that is designed for distributed energy generation.

Hydraulically collapsing blades, trim-flap braking systems, and an environmentally friendly removable footing pioneer multiple advancements in wind turbine technologies and installation methods. Burtek will now spend the next few months re-running the in depth analysis and simulations to verify final material strengths necessary to meet the WIND e20's 20-plus-year operating life, stringent safety requirements and energy production specifications. This final engineering check will prepare the WIND e20 for cost effective manufacturability and mass production.