1. Home
  2. Latest News
  3. NSC Feature - Isle of Man Ferry Terminal
NSC Feature - Isle of Man Ferry Terminal
Published on:12 | 04 | 2022Published in:Uncategorized

We are delighted to be featured in the April edition of the New Steel Construction (NSC) magazine for the Isle of Man Ferry Terminal, Liverpool.

Billington Structures is fabricating, supplying and erecting over 270 tonnes of structural steelwork for this project. The majority of the tonnage is required for the main terminal building, with the remainder needed for three smaller structures: a security building, a check-in structure, and a staff facility.

[Link]

[Link]

Isle of Man Ferry Terminal, Liverpool

More features of the NSC magazine can be found here.

Back to listings

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Billington Holdings plc published this content on 13 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 13 April 2022 12:14:06 UTC.