Big Gold Inc. announced positive assay results from its previously announced infill sampling program ("Infill Sampling") at the Tabor Property, located in the heart of the Shebandowan Greenstone Belt, northwest of Thunder Bay, Ontario. The Infill Sampling was designed to analyze previously sampled and unsampled intervals of historical drill core with the objective of adding new gold mineralization at the Project. Drill hole RS-83-01 returned significant mineralization, intersecting 1.5 metres ("m") of 10.9 grams per tonne ("g/t") gold ("Au"), 34.1 g/t silver ("Ag"), 0.5 % copper ("Cu"), and 1.8 % zinc ("Zn"), including 0.8 m of 20.8 g/t Au, 56.9 g/t Ag, 0.7% Cu, and 3.3% Zn in previously sampled core.

The Infill Sampling program gave Big Gold access to historic core samples drilled in the East Divide area of the Project in 1983 from the Ontario Ministry of Northern Development and Mines ("MNDM") Thunder Bay Core Library, which is home to an extensive collection of approximately 100,000 m of historic core from the Thunder Bay Mining District. In previously unsampled core, three of the four drill holes intersected low-grade gold mineralization within 10 m of the hole end, indicating further potential at depth. Drill hole RS-83-01 intersected 0.2 g/t Au over 1.0 m at the bottom of hole.

Additionally, hole RS-83-07 intersected 0.2 g/t Au over 0.6 m; hole RS-83-14 intersected near-surface gold mineralization grading 0.1 g/t Au over 1.4 m. These results confirm the extension of the Shebandowan Greenstone Belt onto the Tabor Property. The presence of gold and base metal mineralization within quartz veining associated with shear zones, often at the junctions of mafic and intermediate volcanics, is reminiscent of Goldshore Resources Inc.'s ("Goldshore") Moss Lake deposit ("Moss Lake"). The Infill Sampling yielded valuable insights at a minimal cost, including: Verification of historic core to confirm lithology, mineralization, alteration, veining, and structures previously logged.

Acquisition of historic core photographs for archival and future reference. 69 in-fill samples (half-core) from previously unsampled core segments. 26 new samples of previously sampled core sections for zone confirmation.

Phase 2 Plan for Priority Targets: Surface Exploration: Additional field visits may take place to define targets for further detailed mapping and sampling of outcrops. Re-logging and Sampling of Historic Core: Four historic drill holes on the Property have been sampled, results are in progress. IP Survey: Plans are in place to conduct IP surveys, aiming to provide new exploration targets and improved targeting for the 2024 drilling.

Drill Program: Utilizing all of the data collected in 2023 and 2024, the Company will design its initial drill campaign to discover new gold mineralization.