Old Oak Common Station
Project Overview
28 November 2023
Leo Quinn
Group Chief Executive
3
Balfour Beatty and HS2
HS2
- High-speedrailway between Birmingham and London, with a Phase 1 budget of £44.6 billion (2019 prices)
- Balfour Beatty is in joint ventures delivering two parts:
- Area North - the largest section of HS2's route
- Old Oak Common Station
Area North - BBV joint venture
- Added to order book at £3 billion (50% share) in 2020
• Target cost contract
- No material change to order book following recent cancellations
Balfour Beatty is delivering critical elements of HS2 Phase 1
Major infrastructure delivery: Marston box bridge slide
https://www.youtube.com/watch?v=DxGd83rzcts
4
Major infrastructure delivery
M42 bridge demolition | Cubbington cutting earthworks | Deck span for Curzon St viaduct | Bromford tunnelling |
Breadth of capabilities creates competitive advantage
5
Further HS2 work to be awarded
Joint venture established for HS2 opportunities
- Balfour Beatty, alongside JV partners ETF (VINCI owned) and TSO, are shortlisted for four remaining contracts. Balfour Beatty holds a 50% share of the joint venture
- The contracts are:
- Overhead catenary system: £302 million*
- Track installation - Lot 1 Urban: £434 million*
- Track installation - Lot 2 Central: £526 million*
- Track installation - Lot 3 North: £566 million*
- Final bids were submitted in November 2023
- Contracts are expected to be awarded in 2024, with delivery running through the second half of this decade
*Figures are provided to give an idea of scale and match those provided by HS2's contract notices from 2020
• Works - 309373-2020- TED Tenders Electronic Daily (europa.eu).
• Works - 209541-2020- TED Tenders Electronic Daily (europa.eu)
Targeting further HS2 contracts in 2024
6
Potential opportunities following HS2 cancellations
Government plan for 'Transforming British transport'
- Alongside the cancellation of HS2 Phase 2a, the Government committed to spending:
- £36 billion on rail, road and bus improvements
- £12 billion to deliver fast links between Liverpool and Manchester
- This provides additional funding for the road and rail sectors which Balfour Beatty operate in
- Network North includes a mix of new schemes and those previously planned for delivery through:
- The third Road Investment Strategy (RIS 3)
- Network Rail's Control Period 7 (CP7)
Source:https://www.gov.uk/government/news/find-out-about-every-new-transport-project-in-your-region
Funding pledged for a wide range of transport projects
Old Oak Common Station
Nigel Russell & Brendan Seymour
How we are building Old Oak Common Station
https://www.youtube.com/watch?v=EUXzvmn1cy4
8
Health and Safety Performance Indicators
HSPI Target
Overview of the Health and Safety Performance Indicators used across HS2 https://safety.hs2.org.uk/how-were-performing/
Focused on consistently performing ahead of target