Aurcana Silver Corporation announce that it has shipped its first concentrate production from its wholly owned Revenue-Virginius Mine, located in Ouray, Colorado, USA. The Company continues to mine high-grade ore during this time of reduced underground capacity. The processing system's capability has been demonstrated through the mill operating at design capacity and the ability to produce shippable concentrate. However, the lack of consistent ore feed from the mine has been a bottleneck to optimizing processing performance. Going forward, the near term operating plan is to continue to mine the two available stopes on the 1800 level and create a stockpile that will help ensure a longer period of sustained processing run-time. It is expected enough ore will be stockpiled to enable the processing plant to restart again during the first week of January.