August 4, 2022 | ||
For immediate release | ||
Infrastructure Fund Issuer | ||
Takara Leben Infrastructure Fund, Inc. | ||
Representative: | Masahide Kikuchi, | Executive Director |
Securities Code: 9281 | ||
Management Company | ||
Takara Asset Management Co., Ltd. | ||
Representative: | Mamoru Takahashi, | President & CEO |
Contact: | Masahide Kikuchi, | Vice President |
TEL: +81-3-6262-6402
Notice of Monthly Electricity Generation of Solar Power Generation Facilities for July 2022
Takara Leben Infrastructure Fund, Inc, hereby announces the monthly power generation of the solar power generation facilities and CO2 Reduction under its ownership as of the end of July 2022 as follows.
【Monthly Electricity Generation and CO2 Reduction】
Fiscal Period Ended November 2022
Number | Forecast | Actual | CO2 | |||||||||||||||||
Panel | Power | Difference | ||||||||||||||||||
of Solar | Power | Reduction | ||||||||||||||||||
Output | Generation | (kWh) | ||||||||||||||||||
Power | Generation | (kg-CO2) | ||||||||||||||||||
(kW) | (kWh) | (B)-(A) | ||||||||||||||||||
Plant | (kWh) (B) | (Note2) | ||||||||||||||||||
(A)(Note1) | ||||||||||||||||||||
June | 42 | 171,538.48 | 17,865,386 | 19,793,809 | +1,928,423 | 8,959,366 | ||||||||||||||
July | 42 | 171,538.48 | 18,717,713 | 19,694,060 | +976,347 | 8,880,705 | ||||||||||||||
August | ー | ー | 20,725,963 | ー | ー | ー | ||||||||||||||
September | ー | ー | ー | ー | ー | ー | ||||||||||||||
October | ー | ー | ー | ー | ー | ー | ||||||||||||||
November | ー | ー | ー | ー | ー | ー | ||||||||||||||
Total | ー | ー | ー | ー | ー | ー | ||||||||||||||
Due to relatively longer monthly sunshine durations in nationwide, power generation of the entire portfolio for July 2022 had reached 19,694,060 kWh, which is approximately 5.2% higher than the estimated electricity generation on the basis of the expected amounts of electricity generation in the 50th percentiles of probability of exceedance.
The decrease in the amount of electricity generated at the LS Sakuragawa Shimoizumi is due to the fact that one of the two power conditioners has stopped generating electricity as a result of the earthquake off the coast of Fukushima Prefecture that occurred on March 16, 2022. The power plant is continuing to implement restoration measures.
The decrease in the amount of electricity generated at the LS Shirahama Power Station is due to the effects of solar radiation and the fact that some of the power conditioners (11 out of 128 units) have stopped generating electricity due to malfunctions and other reasons.
(Note1) The estimated electricity generation is the total of the expected amounts of electricity generation in the 50th percentile of probability of exceedance calculated by a third party on the basis of the database for hourly solar radiation for a year and others.
(Note2) CO2 reduction is calculated as based on adjusted emission coefficient by electric power companies. For more details, please refer to the link (Japanese): https://ghg-santeikohyo.env.go.jp/calc
【Monthly Electricity Generation and CO2 Reduction by Power Plant】
July 2022
Forecast | Actual | |||||||||||||||||||
Panel | Power | Difference | CO2 | |||||||||||||||||
Power | ||||||||||||||||||||
No. | Name | Output | Generation | (kWh) | Reduction | |||||||||||||||
Generation | ||||||||||||||||||||
(kW) | (kWh)(A) | (B)-(A) | (kg-CO2) | |||||||||||||||||
(kWh)(B) | ||||||||||||||||||||
(Note) | ||||||||||||||||||||
S-01 | LS Shioya | 2,987.25 | 258,269 | 310,239 | +51,970 | 136,815 | ||||||||||||||
S-02 | LS Chikusei | 1,205.67 | 108,108 | 123,764 | +15,656 | 54,580 | ||||||||||||||
S-03 | LS Chiba Wakabaku | 705.10 | 83,642 | 78,455 | -5,187 | 34,599 | ||||||||||||||
S-04 | LS Miho | 1,373.70 | 131,728 | 151,268 | +19,540 | 66,709 | ||||||||||||||
S-05 | LS Kirishima Kokubu | 2,009.28 | 202,222 | 209,460 | +7,238 | 77,500 | ||||||||||||||
S-06 | LS Sosa | 1,796.08 | 191,133 | 244,251 | +53,118 | 107,715 | ||||||||||||||
S-07 | LS Miyagi Osato | 2,040.00 | 191,774 | 221,029 | +29,255 | 115,156 | ||||||||||||||
S-08 | LS Mito Takada | 2,128.00 | 225,461 | 251,927 | +26,466 | 111,100 | ||||||||||||||
S-09 | LS Aomori Hiranai | 1,820.00 | 203,877 | 217,966 | +14,089 | 113,560 | ||||||||||||||
S-10 | LS Tone Fukawa | 2,467.08 | 256,333 | 301,877 | +45,544 | 133,128 | ||||||||||||||
S-11 | LS Kamisu Hasaki | 1,200.00 | 144,933 | 167,199 | +22,266 | 73,735 | ||||||||||||||
S-12 | LS Tsukuba Bounai | 2,469.60 | 262,125 | 280,780 | +18,655 | 123,824 | ||||||||||||||
S-13 | LS Hokota | 1,913.60 | 203,795 | 237,714 | +33,919 | 104,832 | ||||||||||||||
S-14 | LS Nasu Nakagawa | 19,800.00 | 1,847,239 | 2,079,360 | +232,121 | 916,998 | ||||||||||||||
S-15 | LS Fujioka A | 612.00 | 62,490 | 73,277 | +10,787 | 32,315 | ||||||||||||||
S-16 | LS Inashiki Aranuma1 | 2,725.68 | 323,641 | 341,279 | +17,638 | 150,504 | ||||||||||||||
S-17 | LS Fujioka B | 2,420.80 | 248,469 | 293,213 | 44,744 | 129,307 | ||||||||||||||
S-18 | LS Inashiki Aranuma2 | 1,200.00 | 143,288 | 154,012 | +10,724 | 67,919 | ||||||||||||||
S-19 | LS Sakuragawa Shimoizumi | 2,535.04 | 250,578 | 154,743 | -95,835 | 68,242 | ||||||||||||||
S-20 | LS Fukushima Yamatsuri | 1,327.36 | 138,162 | 145,769 | +7,607 | 75,946 |
S-21 | LS Shizuoka Omaezaki | 1,098.24 | 125,905 | 122,422 | -3,483 | 53,009 |
S-22 | LS Mie Yokkaichi | 1,984.50 | 220,103 | 198,179 | -21,924 | 85,812 |
S-23 | LS Sakuragawa Nakaizumi | 2,698.24 | 262,150 | 304,023 | +41,873 | 134,074 |
S-24 | LS Shirahama | 7,839.76 | 941,992 | 841,000 | -100,992 | 267,438 |
S-25 | LS Takahagi | 1,194.60 | 114,887 | 120,443 | +5,556 | 53,115 |
S-26 | LS Hanno Misugidai | 2,402.40 | 258,404 | 255,597 | -2,807 | 112,718 |
S-27 | LS Sakuragawa 1 | 2,545.92 | 246,244 | 291,225 | +44,981 | 128,430 |
S-28 | LS Sakuragawa 4 | 2,421.12 | 234,775 | 282,788 | +48,013 | 124,710 |
S-29 | LS Chiba Sammu East/West | 5,059.20 | 566,097 | 623,011 | +56,914 | 269,764 |
S-30 | LS Nagasaki Isahaya | 2,022.46 | 214,165 | 172,747 | -41,418 | 63,916 |
S-31 | LS Shioya 2 | 11,469.60 | 1,083,013 | 1,233,210 | +150,197 | 543,846 |
S-32 | LS Hiroshima Mihara | 11,216.70 | 1,262,165 | 1,301,920 | +39,755 | 761,623 |
S-33 | LS Sakuragawa 2・3 | 5,091.84 | 489,874 | 549,744 | +59,870 | 242,437 |
S-34 | LS Fukushima Kagamiishi 1 | 712.32 | 75,960 | 80,925 | +4,965 | 42,162 |
S-35 | LS Fukushima Kagamiishi 2 | 712.32 | 76,812 | 82,181 | +5,369 | 42,816 |
S-36 | LS Chiba Narita | 1,296.00 | 124,640 | 140,880 | +16,240 | 62,128 |
S-37 | LS Iwate Hirono | 2,273.70 | 225,588 | 174,845 | -50,743 | 91,094 |
S-38 | LS Miyagi Matsushima | 14,246.40 | 1,620,474 | 1,678,100 | +57,626 | 726,617 |
S-39 | LS Kagoshima Kanoya | 1,172.08 | 126,875 | 127,670 | +795 | 47,238 |
S-40 | LS Miyagi Osato 2 | 2,231.10 | 236,335 | 241,584 | +5,249 | 125,865 |
S-41 | LS Okayama Tsuyama 1, 2 & | 6,477.74 | 749,856 | 751,935 | +2,079 | 439,882 |
3 | ||||||
S-42 | LS Chiba Katsuura | 30,636.00 | 3,984,133 | 4,082,050 | +97,917 | 1,767,528 |
Total | - | 171,538.48 | 18,717,713 | 19,694,060 | +976,347 | 8,880,705 |
End
Our website:https://tif9281.co.jp/en
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Takara Leben Infrastructure Fund Inc. published this content on 04 August 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 August 2022 07:36:02 UTC.