South32 Limited provided production guidance for the fiscal year 2023. For the year, the company expects Worsley Alumina production to be 4,000 kt; Brazil Alumina production to be 1,395 kt; Brazil Aluminium (non-operated) production to be 100 kt; Hillside Aluminium production to be 720 kt; Mozal Aluminium production to be 370 kt; Sierra Gorda(non-operated) - Payable copper equivalent production to be 89 kt; Payable copper production to be 71.8 kt; Payable molybdenum production to be 1.5 kt; Payable gold production to be 29.9 kt; Payable silver production to be 582 kt; Cannington - Payable zinc equivalent production to be 236.1 kt; Payable silver production to be 13,500 koz; Payable lead production to be 122 kt; and Payable zinc production to be 72 kt; Cerro Matoso Payable nickel production to be 43.5 kt; Illawarra Metallurgical Total coal production to be down by 7,000 kt; Metallurgical coal production to be down by 6,000 kt; Energy coal production to be up by 1,000 kt; Australia Manganese ore production to be 3,400 kwmt; South Africa Manganese ore production to be 2,000 kwmt.