27 April 2022
Murchison Lithium Opportunity
Golden Mile Resources Limited ("Golden Mile"; "the Company"; ASX: "G88") advises that it has acquired two (2) Exploration Licences and applied for an additional two (2) Exploration Licenses in the vicinity of its Yarrambee Project located in the Murchison district, WA (Fig 1).
• G88 acquires two Exploration Licenses and applied for two additional Exploration Licences in the Murchison District WA
• The Company is targeting lithium, tungsten, and gold
• Tenement E 20/1005 has mapped pegmatite with historical tungsten occurrences
• Field reconnaissance scheduled for June
The two tenements that are being acquired are Exploration Licenses E 20/1005 and E 59/2405 from Bruce Legendre for a cash consideration of $5,000 and a 1% Net Smelter Royalty. Tenement E 20/1005 has mapped pegmatite with historical molybdenum and tungsten occurrences (Fig 2).
Figure 1.Location of the tenement acquisitions and New Exploration License Applications targeting Lithium and tungsten.
The two new Exploration License Applications are targeting historical GSWA samples reported in the State Geochemistry database that are anomalous in lithium within an area of possible granodiorite.
Figure 2.
GSWA 1:250 000 scale Cue Geological Map showing historical tungsten and molybdenite occurrences and veining within E 20/1005.
The Company has not visited these areas in the field prior to the acquisition of the tenements and has therefore not verified the GSWA field mapping or the State Geochemistry database samples in these areas.
Next Steps
The Company plans to complete a desktop study followed by field reconnaissance in conjunction with the next drilling programme currently being planned at the Company's nearby Yarrambee Project. The Company will provide further details on the project once this work is completed
This Announcement has been approved for release by the Board of Golden Mile Resources Limited.
For further information please contact:
Grant Button - Non-Executive Director 0417 949 326
Golden Mile Resources Ltd (ASX: G88)
ABN 35 614 538 402
T: (08) 6383 6508
E:info@goldenmileresources.com.au
W:www.goldenmileresources.com.au
Note 1: Refer ASX announcement on the said date for full details of these results. Golden Mile is not aware of any new information or data that materially affects the information included in the said announcement.
About Golden Mile Resources Ltd
Golden Mile Resources Ltd (Golden Mile; ASX: G88) is a Western Australian based mineral exploration company with a focus on precious & battery metals with projects located in the Eastern Goldfields, Murchison, Pilbara, and South-West regions.
The ~816km2 Yarrambee Ni, Cu, Zn, PGE & Au Project within the Narndee Igneous Complex located in the Murchison region, WA.
At Quicksilver Ni-Co project, located about 350km southeast of Perth, the Company has delineated an Indicated and inferred Resource 26.3 Mt @ 0.64% Ni & 0.04% Co (cut-off grade >0.5% Ni or >0.05% Co) (
The Company's gold projects are in the highly prospective Eastern Goldfields region, that includes Yuinmery (100%) and the Leonora JV (Kin Mining earning up to 80%).
The Company has recently acquired the Marble Bar and Murchison greenfield lithium Projects
Competent Persons Statement
The information in this report that relates to Exploration Results is based upon and fairly represents information compiled by Mr Jordan Luckett, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Luckett is a part-time employee of the Company and holds Share Options as well as participating in a performance based Share Option plan as part of his renumeration.
Mr Luckett has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Luckett consents to the inclusion in the report of the matter based on his information in the form and context in which it appears.
The Company confirms it is not aware of any new information or data that materially affects the exploration results set out in the in the original announcements referenced in this announcement and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original announcements.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Golden Mile Resources Ltd (ASX: G88) planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may", "potential," "should," and similar expressions are forward-looking statements. Although Golden Mile Resources Ltd (ASX: G88) believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements
.
Section 1 - Sampling Techniques and Data
personal use only
Criteria | JORC Code explanation | Commentary |
Sampling techniques |
| Not Applicable - No historical or current exploration results reported |
Drilling techniques |
| Not Applicable - No historical or current exploration results reported |
Drill sample recovery |
| Not Applicable - No historical or current exploration results reported |
Logging |
| Not Applicable - No historical or current exploration results reported |
Sub-sampling techniques and |
| Not Applicable - No historical or current exploration results reported |
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Golden Mile Resources Ltd. published this content on 26 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 27 April 2022 01:04:11 UTC.