CANARA BANK - TENDER FOR EXTERNAL CIVIL WORKS AND INTERNAL RENOVATION OF 56 FLATS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BENGALURU
FINANCIAL BID
SPECIFICATIONS OF CIVIL WORKS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BANGALORE
S.No DESCRIPTION OF ITEM | UNIT | QTY | RATE in Rs | AMOUNT in |
Rs |
NOTE :
THE RATES IS EXCLUSIVE OF GST AND INCLUSIVE OF ALL LEAD, LIFT, CARTING AWAY ALL DEBRIS FROM SITE AND STAGING WORK/CHIESELING WORK AT VARIOUS FLOOR LEVELS FOR ALL ITEMS, UNLESS OTHERWISE MENTIONED
THE MAKE OF MATERIALS SHOULD BE APPROVED BY THE BANK BEFORE EXECUTION OF WORK.
THE FINANCIAL BID TO BE ANNEXED IN SEPERATE ENVELOPE.
- EXTERNAL WORKS
- EXTERNAL PAINTING WORKS
Providng external weatherproof painting over existing works using approved exterior grade emulsions of ASIAN / BERGER / NEROLAC or other approved equivalent make with standard procedures specified by manufacturer and approved by the Engineer in
Charge.
-
Surface Preparation & Crack Treatment
Surface shall be made free from all dust, laitance,vegetation ,loose partcles and sharp edges. Fungus and Algae or the organic matters shall be removed using suitable tools from all surfaces identified for painting. The works includes washing, thorough scraping of the existing flakes of paint surface including old coats, dirt and as indicated by the engineer in charge. Item also includes treatment of all cracks by cutting a V groove along the longitudinal section of cracks and filling it with approved fiber glass reinforced crack filling compound or polymer modified mortar admixed with anti-shrink additives (modified styrene butadiene rubber (SBR) at methodologies and dosages as specified by the manufacturer and apporved by the Enginner-In Charge. The treated cracks are to be provided with one coat of suitable primer post curing.Rate should include costs of all leads and lift, cost and conveyance of all materials, labour, scaffolding, infrastructure and cleaning the cladding surfaces after completing the work etc., at all heights upto 4th floor level
and to include incidental charges.
-
Loose plaster treatment
Chipping of loose layers of plaster and replastering with polymer modified mortar admixed with admixed with modified styrene butadiene rubber (SBR) at 1:1 dosage and as per methodologies specified by the manufacturer and apporved by the Enginner-In Charge. The treated surfaces shall be provided with one coat of suitable primer post curing.Rate should include costs of all leads and lift, cost and conveyance of all materials, labour, scaffolding, infrastructure and cleaning after completing the work etc., at all heights upto 4th floor level and to include incidental charges.
- Exterior Weatherproof Emulsion
Providing and applying water based acrylic exterior emulsion paint of Asian Paints Apex Shyne make or equivalent make as per the shade approved by the Bank with one coat of exterior wall primer and two coats of acrylic emulsion as per methodologies and specifications of the manufacturer. Rate should include costs of all leads and lift, cost and conveyance of all materials, labour, scaffolding, infrastructure amd cleaning the paint drops on glass, cladding surfaces after completing the work etc., at all heights upto 4th floor level and to include incidental charges.
Perfomance guarantee certificate of the weatherproof coating for a period of 5 years to be submitted to the Engineer in charge in the prescribed format on Rs.200 non judicial stamp paper on completion.
SFT 52,000
SFT 400
SFT 52,000
SIGNATURE OF THE TENDERER WITH SEAL
CANARA BANK - TENDER FOR EXTERNAL CIVIL WORKS AND INTERNAL RENOVATION OF 56 FLATS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BENGALURU
II INTERNAL PAINTING WORKS
-
INTERIOR EMULSION PAINTING - COMMON AREAS
Providing & applying to the interior wall surfaces at all floors with two coats of interior grade water based emulsion of Asian Paints Apcolite Premium Satin make or equivalent using shades apporoved by the Bank with silicon additives and anti- fungal properteis as per methodologies prescribed by the manufacturer. The item includes filling the cracks with approved crack fillers, one coat of wall putty, washing, thorough scraping of existing loose paint layers, dirt etc. The rate coated shall include cost of all leads and lift, cost and conveyance of all materials, labour, scaffolding and subsequent cleaning of floor etc after completion of works.
- INTERIOR EMULSION PAINTING - BASEMENT
Providing & applying to the interior wall surfaces for basement level with interior grade water based emulsion of Asian Paints Tractor make or equivalent using shades apporoved by the Bank with anti-fungal properteis in TWO or more coats as per methodologies prescribed by the manufacturer. The item includes filling the cracks with approved crack fillers, washing, thorough scraping of existing loose paint layers, dirt etc. The rate coated shall include cost of all leads and lift, cost and conveyance of all materials, labour, scaffolding and subsequent cleaning of floor etc after completion of works.
- OIL BOUND DISTEMPER FOR CEILING
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade in two coats over exisitng work and including water tinnable priming coat with cement primer
- SYNTHETIC ENAMEL EMULSION PAINTING
Providing & applying two coats of synthetic enamel paint of approved brand and manufacture of required colour shades apporoved by the Bank to give an even shade on old work after throuogh cleaning and scrapping off the exisitng loose layers of paint. The rate coated shall include cost of all leads and lift, cost and conveyance of all materials, labour, scaffolding and subsequent cleaning of floor etc after completion of works
- COMMON AREA CIVIL WORKS
-
DISMANTLING EXISITING CERAMIC TILE FLOORING
Dismantling exisitng terrazzo tile work in floor / skirting laid in cement mortar including carting away of the debris away from the site and disposing abiding municipal laws complete as per the direction of Engineer In Charge. Plan area shall be considered for measurement, excluding the skirting.
- VITRIFIED TILE FLOORING FOR COMMON AREAS
Providing & laying nano polished vitrified floor tiles in sizes 600mm x 600mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and confirming to IS:15622 of approved make in all colours and shades laid on 25-45mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) with 3mm spacers etc complete. Basic cost of tiles Rs.45/- per sft.
- VITRIFIED TILE SKIRTING
Providing & laying vitrified floor tiles skirting in thickness of 100mm (thickness of tile to be specified by the manufacturer) with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 20 mm thick cement mortar 1:4 (1cement: 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joint with white cement & matching pigments etc. complete.
- GRANITE STONE CLADDING
Providing and fixing 18 mm thick machine cut, mirror/eggshell polished, granite stone works for wall lining including dado, skirting, risers of steps etc in required design and pattern wherever required, stones of different finished surfaces in 12mm (average) thick cement mortar 1:3 mix laid and jointed with white cement slurry @3.3Kg/sqm including pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and directed by the Engineer In Charge.Basic cost = Rs. 150 per sft
SFT 10,850
SFT 3,500
SFT 4,900
SFT 6,000
SFT 4,900
SFT 4,900
RFT 1,350
Granite stone slab jet black, cherry red, elite brown, cat eye or equivalent. | SFT | 300 |
SIGNATURE OF THE TENDERER WITH SEAL
CANARA BANK - TENDER FOR EXTERNAL CIVIL WORKS AND INTERNAL RENOVATION OF 56 FLATS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BENGALURU
IV | PLUMBING WORKS | ||
1 | CORE CUTTING OF RCC SLAB | ||
Cutting cores of following sizes in reinforced concrete slab of thickness 100mm - | |||
150mm, including cutting of reinforcement bars , using mechanised tools like core | |||
drilling machines etc complete as per the direction of the Engineer in charge. | |||
i | 25mm | Nos | 56 |
ii | 75mm | Nos | 56 |
- SWR DRAIN PIPES FOR BALCONIES
Providing and fixing TYPE A SWR uPVC pipes (Supreme make or equivalent) of following nominal diameter with all uPVC fittings such as collars, couplers, rings, GI clamps etc. This includes jointing of pipes & fittings with rubber rings, rubber lubricants & testing of joints complete as per direction of Engineer in Charge.
i | 75mm | RFT | 860 |
ii | 150mm | RFT | 100 |
- DRINKING WATER PIPELINES
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.Concealed work, including cutting chases and making good the walls etc.
25 mm nominal outer dia | RFT | 1,050 | |
4 | PVC FLOOR TRAP (110mmx75mm) of supreme make or equivalent | Nos | 56 |
5 | PVC DOOR 'Y' (75mm) of supreme make or equivalent | Nos | 56 |
- CONSTRUCTION OF CHAMBERS
-
DISMANTLING EXISITING CONCRETE FLOORING
Dismantling the existing 6" thick cement concrete flooring and carting away the debris.
- EARTHWORK EXCAVATION
Earth work excavation in ordinary soil for trenches for sanitary lines and for chambers upto a height of 1.5m, dressing of sides and ramming of bottom and filling back the excavated earth in to the trenches and removal of excess earth and carting away etc., complete
- PLAIN CEMENT CONCRETE
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering.
a) 1:4:8 for bottom of trenches
a) 1:2:4 for surface, smooth finished
-
MASONRY CHAMBERS WITH COVERS
Constructing masonry Chamber of following sizes, in common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in cement mortar 1:4 (1 cement : 4 coarse sand), with C.I. chamber frame and Top cover, i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design.
SFT 190
CFT 320
CFT 100
CFT 100
30x30x45 cm | Nos | 6,000 |
TOTAL OF EXTERNAL WORKS (A) (exclusive of GST) in Rs.
SIGNATURE OF THE TENDERER WITH SEAL
CANARA BANK - TENDER FOR EXTERNAL CIVIL WORKS AND INTERNAL RENOVATION OF 56 FLATS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BENGALURU
- INTERNAL RENOVATION OF 56 FLATS
- DISMANTLING WORKS
-
DISMANTLING EXISITING KITCHEN COUNTERS
a) Kitchen RCC counter top and supporting masonry structure (approx 10 Rft)
- DISMANTLING EXISITING DOORS
Dismantling doors of area 3 sq. metres and below wooden shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead as per the direction of Engineer In Charge.
- DISMANTLING EXISITING WINDOW SHUTTERS
Dismantling steel window shutter of opening area 3 sq. metres and below shutter. complete and stacking within 50 metres lead as per the direction of Engineer In Charge.
- DISMANTLING EXISITING CERAMIC TILE AT FLOORS & WALLS
L/S | 56 |
NOS | 64 |
NOS | 236 |
Dismantling tile work in floors and roofs laid in cement mortar in locations as below including including carting away of the debris away from the site and disposing abiding municipal laws complete as per the direction of Engineer In Charge.
- Floor tiles in toilets
- Wall tiles in toilets
-
DISMANTLING EXISITING GI PIPELINES
Cutting chases in the walls and dismantling exisitng GI pipelines (concealed) in toilets and kitchen including carting away of the debris away from the site and and stacking within 50 metres lead as per the direction of Engineer In Charge. Rate quoted shal be for per toilet block of maximum size of 45 Sft.
- DISMANTLING EXISITING WATER CLOSETS & FLUSHING CISTERNS
Dismantling exisitng indian / western water closets + flushing cisterns and carting away of the debris away from the site and disposing abiding municipal laws complete as per the direction of Engineer In Charge.
- DISMANTLING EXISITING WASH BASIN
Dismantling exisitng wall mount wash basin and carting away of the debris away from the site and disposing abiding municipal laws complete as per the direction of Engineer In Charge.
- DISMANTLING EXISITING CERAMIC TILE FLOORING
Dismantling exisitng terrazzo tile work in floor / skirting laid in cement mortar including carting away of the debris away from the site and disposing abiding municipal laws complete as per the direction of Engineer In Charge. Plan area shall be considered for measurement, excluding the skirting.
SFT | 2,164 |
SFT | 6,880 |
PER | 64 |
TOILET | |
NOS | 64 |
NOS | 64 |
SFT | 26,248 |
- CONCRETE / MASONRY WORKS
1 BRICK MASONRY
Providng and constructing brick work with class A common burnt clay bricks in all shapes and sizes in cement mortar 1:4 and curing the wall.
- PLAIN CEMENT CONCRETE
Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand
: 8 graded stone aggregate ) using downgraded aggregates of size 12.5mm at an average thickness of 25mm
CFT 2,164
SFT 26,248
SIGNATURE OF THE TENDERER WITH SEAL
CANARA BANK - TENDER FOR EXTERNAL CIVIL WORKS AND INTERNAL RENOVATION OF 56 FLATS AT SAHAYADRI APARTMENTS, MYSORE ROAD, BENGALURU
III WATERPROOFING OF TOILETS
Providng water proofing treatment over sunken slabs of toilets using admixtures of CERA/FOSROC/SIKA/DR.FIXIT/ASIAN or other approved equivaent make with standard
-
procedures specified by manufacturer and approved by the Engineer in Charge. The treatment to be carried out by authorised applicator of the approved manufacturer. The brief methodology to be followed are as below :
Removing existing brickbat coba to expose the mother slab and stacking at site as per instructions of the Engineer-In-Charge.
Cleaning the surface with wire brush on the slab to remove all deleterious matters.Cutting of 'V' grooves along the cracks and wall-slab joints and filled with cement sand mortar admixed with anti-shrink additives, (modified styrene butadiene rubber (SBR) based) at dosages as specified by the manufacturer.
Applying a priming or bond coat above the surface of existing Brick bat coba using SBR latex admixed cement mortar (1:3) of thickness 25mm while in tacky state as per dosages specified by the manufacturer. Slopes as required to be maintained and a 20mm dia PVC outlet drain pipe to be provided at the lowest slope to discharge the collected water.
Supply and application of waterproof coating on the prepared surface in a continuous film on the floor of the sunker portion with 2 coat flexible, micro fibre reinforced, cementitious product modified with special alkali-resistant polymers which can produce a flexible membrane for waterproofing. Two coats should be applied over the horizontal floor surfaces and vertical surfaces of wall over the coving up to 300mm above the final finished floor level (before tiling). The coating shall also be continued on to the inner surfaces of the pipe penetration holes. The first coat of treatment shall be applied over a primer coat. After application of the first coat a fibre cloth mesh to be laid when the coat becomes tacky. Minimum 100 mm lapping to be maintained on the edges of fibre cloth mesh.
After curing of the first coat, top coat to be applied on the right angle of first coat and to be allowed to dry for six hours before starting other activities of floor finish. A layer of sand is to be sprinkled on this 2nd coat in horizontals while in tacky stage. Ponding test to be done free of cost for 48 hrs and to check from soffit to ensure zero water seepage from the slab and joints. The treatment shall cover the slab and
vertical surfaces of walls by 150mm above the tiled surface level.
Necessary time interval between coats, curing time to be provided as per the methodologies specified by each of the manufacturer. The mixing proportions and coverages shall be also as specified by the manufacturer.
Material and methodology of waterproofing to be got apporved by the enginner in charge before application.
APPLICATION TO BE DONE BY AUTHORIZED PROFESSIONALS OF THE RESPECTIVE
APPROVED MANUFACTURERS.
Payment shall be for the total plan area of sunker portion, excluding the wall verticals.
Perfomance guarantee cetificate of the installed waterproofing system for a period of 5 years to be submitted to the Enginner in charge in the prescribed format on Rs.200 non judicial stamp paper on completion/satisfactory testing of the waterproofing system.
- RE-FILLINGBRICK BAT COBA
Laying the removed brick bat coba stacked at site and laying in the sunken portion , mixing with cement mortar of 1:4:8 mix proportion (cement : coarse sand : brickbat) with proper compaction and levelling. The rate coated shall include cost of all leads and lift, cost and conveyance of all materials, labour, and subsequent cleaning / disposal of excess materials after completion of works etc.
SFT 2,164
CFT 2,724
SIGNATURE OF THE TENDERER WITH SEAL
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original document
- Permalink
Disclaimer
Canara Bank Ltd. published this content on 15 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 16 November 2021 11:26:04 UTC.