South African electricity public utility Eskom has inspected Azelio’s energy storage installation at farming company
The installation has been supplying electricity to the customer's operation for some time, but before any system is synchronized (or grid-tied) with the Eskom electricity network, it must receive an approval from the national utility. The approval process includes a site inspection, which has now been carried out by a representative of Eskom, with satisfactory result.
The energy system at
“This is an important and necessary step for our installation, the first of its kind in South Africa,” says Jonas Wallmander, CEO of
“From its inception, the project has been designed to fulfil all requirements, including those of Eskom. Nevertheless, this milestone underlines that our system has been successfully installed and commissioned to meet industry requirements,” adds Jonas Wallmander.
© Modular Finance, source