Adriatic Metals plc Provides Production Guidance for the Years 2024, 2025 and 2026
For the year 2025, the company expects ore mined to be in the range of 750 kt to 850 kt. Zinc production of 5.8% to 7.8%. Silver production of 259 g/t to 345 g/t. Lead production of 3.6% to 4.9%, Copper production of 0.5% to 0.7%, Gold production of 2.4 g/t to 3.2 g/t.
For the year 2026, the company expects ore mined to be in the range of 800 kt to 900 kt. Zinc production of 6.1% to 8.1%. Silver production of 211 g/t to 281 g/t. Lead production of 3.5% to 4.7%, Copper production of 0.5% to 0.7%, Gold production of 2.1 g/t to 2.8 g/t.