Tekmar Energy's Generation 10 cable protection systems are almost here

16/12/20

Tekmar Energy, a Tekmar Group company, is readying it's manufacturing facilities in the North East of England to commence production of Generation 10 cable protection systems (CPS) in early 2021.

Since their launch in 2007 and 2013 respectively, Tekmar Energy has delivered over 8,800 TekLink® and TekTube® systems which are installed on over 90 offshore wind projects to protect over 30GW of subsea infrastructure worldwide.

Generation 10 brings together the latest advancements of these systems which are now cross-compatible and highly configurable in order to meet future project demands, including bigger turbines, larger cables, new climatic conditions, latest installation techniques, and utilising improved cable data.

← Back to news

Attachments

  • Original document
  • Permalink

Disclaimer

Tekmar Group plc published this content on 16 December 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 16 December 2020 09:42:04 UTC