Globex Mining Enterprises Inc. to provide shareholders with a brief update regarding the Eagle Gold Mine property ("Eagle") optioned by Globex to Maple Gold Mines Ltd. Maple Gold has completed its second drill program at Eagle. Hole EM-22-009 intersected 11.39 g/t Au over 3 metres including 24.4 g/t Au over 1 metre ("m") in a mineralized horizon that is parallel to the main Eagle-Telbel mine horizon. Three (3) drill rigs are currently turning at Eagle, where Maple Gold's previously announced 5,000m Phase III drill program is expected to be completed by year-end.

Maple Gold has also completed an airborne Mag-EM Survey utilizing the Geotech Ltd. VTEMTM Plus Time Domain EM system with a horizontal magnetic gradiometer configuration. The survey outlined a number of priority anomalies both north and south of the past-producing Eagle mine. The work by Maple Gold confirming significant gold values in the horizon adjoining and parallel to the main Eagle-Telbel mine horizon and the geophysical survey which indicated anomalous areas both north and south of the Eagle mine augur well for the potential of ongoing exploration on the property.