3RD QUARTER 2021

1

Operational Indicators History

RENEWABLES

UN

9M21

9M20

9M19

9M18

WIND AND SOLAR INSTALLED CAPACITY

Installed Capacity

MW

12,268

10,988

10,425

10,897

Portugal

MW

1,238

1,164

1,164

1,280

Spain

MW

2,177

1,974

1,969

2,312

Rest of Europe

MW

1,616

1,383

1,263

1,612

North America

MW

6,569

6,135

5,562

5,363

Brazil

MW

639

331

467

331

Asia

MW

28

0

0

0

Capacity under Construction

MW

2,385

1,893

834

900

Portugal

MW

125

6

0

76

Spain

MW

61

28

24

0

Rest of Europe

MW

553

205

130

89

North America

MW

626

1,393

680

598

Brazil

MW

1,021

260

0

137

Equity Installed Capacity

1

MW

781

560

411

331

Portugal

MW

31

10

0

0

Spain

MW

156

152

152

152

Rest of Europe

MW

43

0

0

0

North America

MW

552

398

259

179

Brazil

MW

0

0

0

0

Capacity under Construction MEP

1

MW

269

269

330

0

Portugal

MW

0

0

14

0

Rest of Europe

MW

269

269

316

0

WIND AND SOLAR NET ELECTRICITY GENERATION

GWh

21,462

20,355

21,893

20,667

Portugal

GWh

2,114

1,808

2,187

2,133

Spain

GWh

3,496

3,088

3,902

3,760

Rest of Europe

GWh

2,270

2,271

2,488

2,363

North America

GWh

12,365

12,403

12,058

11,575

Brazil

GWh

1,204

785

1,258

836

Asia

GWh

14

0

0

0

WIND AND SOLAR TECHNICAL AVAILABILITY

97

97

97

97

Portugal

%

98

98

98

98

Spain

%

96

95

97

97

Rest of Europe

%

98

98

96

97

North America

%

96

96

97

97

Brazil

%

99

98

98

98

Asia

%

n.d.

0

0

0

1

Share of the M W installed in plants owned by companies equity consolidated

INTERIM REPORT 9M21

2

RENEWABLES

UN

9M21

9M20

9M19

9M18

HYDRO INSTALLED CAPACITY

MW

7,127

8,785

8,785

9,019

Portugal

MW

5,076

6,759

6,759

6,862

Spain

MW

451

426

426

426

Brazil

1

MW

1,599

1,599

1,599

1,731

EQUITY HYDRO INSTALLED CAPACITY

MW

551

551

551

539

Installed Capacity

Brazil

MW

551

551

551

539

Capacity under Construction

MW

78

78

78

78

Brazil

MW

-

-

-

-

Peru

MW

78

78

78

78

HYDRO NET ELECTRICITY GENERATION

GWh

11,296

13,590

8,967

15,206

Portugal

GWh

7,111

9,148

5,458

10,212

Spain

GWh

544

448

476

885

Brazil

GWh

3,641

3,994

3,033

4,109

HYDRO TECHNICAL AVAILABILITY

Portugal

%

91

93

90

92

Spain

%

100

100

100

100

Brazil

%

98

92

98

93

1

Share of the M W installed in plants owned by companies equity consolidated

3

NETWORKS

UN

9M21

9M20

9M19

9M18

DISTRIBUTION

Electricity distributed

GWh

63,302

56,218

59,182

60,114

Portugal

GWh

33,197

32,665

33,802

34,480

Spain

GWh

10,603

5,562

6,266

6,998

Brazil

GWh

19,501

17,990

19,114

18,636

Electricity supply points

'000

11,380

10,550

10,427

10,301

Portugal

'000

6,355

6,306

6,269

6,217

Spain

'000

1,375

670

668

666

Brazil

'000

3,651

3,574

3,490

3,419

Grid extension

Km

377,037

343,521

340,437

338,822

Portugal

Km

229,751

228,242

226,729

226,240

Overhead lines

Km

180,279

179,119

177,780

177,445

Underground lines

Km

49,472

49,123

48,948

48,795

Spain

Km

52,532

20,805

20,729

20,662

Overhead lines

Km

39,642

15,740

15,719

15,707

Underground lines

Km

12,891

5,065

5,010

4,955

Brazil

Km

94,753

94,474

92,980

91,920

Overhead lines

Km

94,478

94,208

92,724

91,673

Underground lines

Km

275

266

255

247

GRID LOSSES

%

8

10

10

10

Portugal

1

Spain

%

4

4

3

3

Brazil

%

10

10

10

10

SERVICE QUALITY

Portugal

Min

39

44

38

44

Installed Capacity Equivalent Interruption Time

2

Spain

Min

26

7

13

14

Installed Capacity Equivalent Interruption Time

2

Brazil

Average Interruption Duration per Consumer

EDP São Paulo

Hours

7

7

8

8

EDP Espírito Santo

Hours

8

8

9

8

Frequency of Interruptions per Consumer

EDP São Paulo

#

5

5

5

5

EDP Espírito Santo

#

4

5

5

5

TRANSMISSION

Grid extension

Km

1,496

1,441

1,441

1,299

Grid extension in Operation

Km

486

316

113

-

Grid extension Under Construction

Km

1,011

1,125

1,328

1,299

1In 2021, the loss indicator was changed to consider the energy input in the grid, and not the output (as until

that the regulator will incorporate this change in the next regulatory period, to align with common practice in

Brazil).

2

ICEIT in M V grid, excluding extraordinary events

2020), according to the expectation other countries (namely Spain and

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

EDP - Energias de Portugal SA published this content on 30 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 November 2021 17:10:01 UTC.