Purpose of this document
Published date Contents Description
Contact details 1/20/22
Version 1 Abbreviations Abbreviations used throughout this document
James Nixon
HSE Superintendent Locations of Air Quality Monitoring Stations A detailed site map of the air quality monitoring stations
(02) 6544 5800 Air Quality Monitoring Data (Particulate Matter (PM10)) Tabulated air quality monitoring data - PM10
Licensee details
LICENCE NUMBER 11457 Locations of Water Monitoring Stations A detailed site map of the water monitoring stations
HUNTER VALLEY ENERGY COAL PTY LTD Water Monitoring Data Tabulated water monitoring data
PMB 8
MUSWELLBROOK NSW 2333 Locations of Noise Monitoring Stations A detailed site map of the noise monitoring stations
Noise Monitoring Data Tabulated noise monitoring data
Premises
MT ARTHUR COAL Locations of Blast Monitoring Stations A detailed site map of the blast monitoring stations
THOMAS MITCHELL DRIVE Blast Monitoring Data (Overpressure) Tabulated blast monitoring data - overpressure
MUSWELLBROOK NSW 2333 Blast Monitoring Data (Vibration) Tabulated blast monitoring data - vibration
Link to the licence on the EPA website Correction Log Corrections to previously published data
EPL 11457

Mt Arthur Coal Environmental Monitoring Data December 2021

Mt Arthur Coal is required to provide environmental monitoring data to the general public to comply with its obligations under section 66(6) of the Protection of the Environment Operations Act 1997. The air quality, water, noise and blasting monitoring data included in this document has been obtained as a result of monitoring conditions specified under Environmental Protection Licence 11457, and is limited to data that relates to pollutants generated, discharged or emitted from the licensed premises.

https://apps.epa.nsw.gov.au/prpoeoapp/ViewPOEOLicence.aspx?DOCID=149666&SYSUID=1&LICID=11457
Abbreviations
Back to Main Menu
Abbreviations
dB (Lin Peak) Noise decibels (linear)
dB(A) Noise decibels (A-weighted)
EPL Environment Protection Licence
m/s Metres per second
mm/s Millimetres per second
LAeq (15 minute) Average noise energy over a 15 minute period
ºC Degrees Celsius
pH Potential hydrogen
PM10 Particulate matter with a diameter of less than 10 microns
TSS Total suspended solids

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Sitemap #1 Air
Back to Main Menu
Air Quality Monitoring Data (Particulate Matter (PM10))
Air Quality Monitoring Locations

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Air Monitoring PM10
Back to Main Menu
Locations of Air Quality Monitoring Stations
Published date 1/20/22
Air Quality Monitoring Data (PM10)
Information related to air quality monitoring PM10 limits and conditions
No limits are specified under the EPL.
The statistical summary data below excludes periods when instruments are not operational due to calibration, breakdown or power failure.
EPA identification no. Sampling point Reference point Sampling period start date Sampling period finished date Unit of measure Averaging period Monitoring frequency Minimum value Mean value Median value Maximum value Data Recovery %
11 DC10 Edinglassie West 01/12/2021 12/31/21 micrograms per cubic metre 24 hours Continuous 4.5 28.4 27.8 67.3 100
12 DC11 Hunter River Pump 01/12/2021 12/31/21 micrograms per cubic metre 24 hours Continuous 2.2 24.0 20.2 129.3 100
13 DC12 Drayton Void 01/12/2021 12/31/21 micrograms per cubic metre 24 hours Continuous 2.3 26.1 14.5 295.1 100
14 DC13 Bayswater 01/12/2021 12/31/21 micrograms per cubic metre 24 hours Continuous 2.3 21.9 18.4 92.1 100

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Sitemap #2 Water
Back to Main Menu
Water Monitoring Data
Water Monitoring Locations

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Water Discharge
Back to Main Menu
Locations of Water Monitoring Stations
Published date 1/20/22
Water Monitoring Data
Information related to water monitoring limits and conditions
The 100 percentile concentration limit is defined as an absolute pollutant/measured concentration limit which must be met all times.
EPA Identification No. 5 is the discharge point under Hunter River Salinity Trading Scheme. All limits presented below apply at EPA Identification No. 5.
EPA Identification No. 6 is the monitoring point for water quality and volume monitoring for discharges under the Hunter River Salinity Trading Scheme.
Water monitoring data will only appear if there has been a discharge under the Hunter River Salinity Trading Scheme (HRSTS).
Pollutant EPA identification no. EPL conditions Sampled date Date obtained Commencement date of discharge Cessation date of discharge Unit of measure Monitoring frequency Measured value 100 percentile concentration limit Limit Exceedance (yes/no) Observations
Total Suspended Solids 5 Concentration limits - - - - milligrams per litre - - 120 N/A - No water discharge during this period
pH 5 Concentration limits - - - - pH - - 6.5 (lower limit) * N/A - No water discharge during this period
9.0 (upper limit) *
Water Volume 5 Volume and mass limits - - - - megalitres per day - - N/A 450 - No water discharge during this period
* For pH, the measured value must not be below 6.5 (lower limit) or above 9.0 (upper limit) to comply with 100 percentile concentration limit.
Pollutant EPA identification no. EPL conditions Sampled date Date obtained Commencement date of discharge Cessation date of discharge Unit of measure Monitoring frequency Measured value Observations
Conductivity 6 Requirement to monitor concentration of pollutants discharged - - - - microsiemens per centimetre Continuous during discharge - No water discharge during this period
pH 6 Requirement to monitor concentration of pollutants discharged - - - - pH Daily during any discharge - No water discharge during this period
Total Suspended Solids 6 Requirement to monitor concentration of pollutants discharged - - - - milligrams per litre Daily during any discharge - No water discharge during this period
Water Volume 6 Requirement to monitor volume or mass - - - - megalitres per day Continuous during discharge - No water discharge during this period
' - ' denotes no data available, as no discharges occured in the month

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Sitemap #3 Noise
Back to Main Menu
Noise Monitoring Data
Noise Monitoring Locations

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Noise
Back to Main Menu
Locations of Noise Monitoring Stations
Published date 1/20/22
Noise Monitoring Data
Information related to noise monitoring limits and conditions
In accordance with EPL11457, LAeq (15 minute) is the value of LAeq (15 minute) which shall not be exceeded for more than 10% of the monitoring periods detailed in the noise monitoring program for independent noise investigations and includes the full range of weather conditions occur.
Day refers to 7am to 6pm, evening 6pm to 10pm and night 10pm to 7am.
Attended monitoring is undertaken during Day Evening and Night one monitoring event a year, and only conducted at night for the other months. This is because atmospheric conditions enhance noise propagation most during this time period (offsite levels are likely to be highest then) and the same or lower criterion applies as for other times. Consequently, night period monitoring enables measurement of noise during worst case conditions that are most likely to contribute to a regulatory exceedance.
Real-time noise monitoring (not required under the EPL) is used to manage and assess noise 24 hours per day.
Sampling point Reference point Start time Date sampled Measurement period Date of final report Period Unit of measure Measured levels LAeq(15 minute) noise limits Wind Speed m/s Wind Direction MN VTG Deg C/100m Stability Class Exceedance (yes/no) Observations
NP04 Balmoral Road 0:05 12/7/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) IA 38 0.4 280 -1.3 D Nil -
NP07 Racecourse Road 0:26 12/7/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) <25 39 0.0 N/A -1.3 D Nil -
NP10 South Muswellbrook 2:25 12/7/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) <25 39 0.0 N/A -0.7 D Nil -
NP12 Pamger Drive 1:24 12/7/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) IA 39 0.0 N/A -1.0 D Nil -
NP13 Golden Highway 22:00 12/6/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) 31 35 1.1 180 -0.8 D N/A -
NP14 Roxburgh Road 23:30 12/6/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) IA 35 0.0 N/A -1.6 C Nil -
NP15 Wellbrook 22:39 12/6/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) 31 35 0.0 N/A -0.9 D N/A -
NP16 Skellatar North 1:12 12/7/21 15 minutes 1/17/22 Day LAeq (15 minute) dB(A) <25 37 1.0 60 -1.2 D Nil -
' - ' denotes no data available.
'IA' denotes inaudible.
NM' denotes audible but not measurable.
VTG: vertical temperature gradient
NA in exceedance column means atmospheric conditions outside those specified in project approval, therefore criterion was not applicable;

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Sitemap #4 Blast
Back to Main Menu
Blast Monitoring Data (Overpressure)
Blast Monitoring Data (Vibration)
Blast Monitoring Locations

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Blasting (Overpressure)
Back to Main Menu
Blast Monitoring Data (Vibration)
Locations of Blast Monitoring Stations
Published date 1/20/22
Blasting Monitoring Data (Overpressure)
Information related to blasting limits and conditions
The 100 percentile limit is defined as an absolute measured limit which must be met all times.
The 95 percentile limit means that monitoring results must not exceed the specified limit for 95% of the reporting period.
The reporting period is defined as the period of 12 months after the issue of the licence, and each subsequent period of 12 months. The reporting period for EPL 11457 is currently 31 August 2018 to 30 August 2019.
The airblast overpressure level from blasting operations in or on the premises must not exceed:
a) 115 dB (Lin Peak) for more than 5% of the total number of blast during each reporting period (Table 2);
b) 120 dB (Lin Peak) at any time.
Table 1: Blasting results for the month
EPA identification no. Sample point Reference point Time/date of blast Date obtained Unit of measure Measured value 100 percentile limit 95 percentile limit Exceedance (yes/no) Observations
7 BP04 South Muswellbrook 12/4/21 13:31 12/4/21 dB (Lin Peak) 89.7 120 115 No
8 BP07 Sheppard Avenue 12/4/21 13:31 12/4/21 dB (Lin Peak) 97.1 120 115 No
9 BP09 Denman Road West 12/4/21 13:31 12/4/21 dB (Lin Peak) 103.9 120 115 No
10 BP11 Balmoral Road 12/4/21 13:31 12/4/21 dB (Lin Peak) 91.5 120 115 No
7 BP04 South Muswellbrook 12/4/21 13:31 12/4/21 dB (Lin Peak) 89.7 120 115 No
8 BP07 Sheppard Avenue 12/4/21 13:31 12/4/21 dB (Lin Peak) 97.1 120 115 No
9 BP09 Denman Road West 12/4/21 13:31 12/4/21 dB (Lin Peak) 103.9 120 115 No
10 BP11 Balmoral Road 12/4/21 13:31 12/4/21 dB (Lin Peak) 86.7 120 115 No
7 BP04 South Muswellbrook 12/7/21 13:31 12/7/21 dB (Lin Peak) 88 120 115 No
8 BP07 Sheppard Avenue 12/7/21 13:31 12/7/21 dB (Lin Peak) 96.1 120 115 No
9 BP09 Denman Road West 12/7/21 13:31 12/7/21 dB (Lin Peak) 100.7 120 115 No
10 BP11 Balmoral Road 12/7/21 13:31 12/7/21 dB (Lin Peak) 85 120 115 No
7 BP04 South Muswellbrook 12/7/21 12:10 12/7/21 dB (Lin Peak) 89 120 115 No
8 BP07 Sheppard Avenue 12/7/21 12:10 12/7/21 dB (Lin Peak) 92 120 115 No
9 BP09 Denman Road West 12/7/21 12:10 12/7/21 dB (Lin Peak) 83.4 120 115 No
10 BP11 Balmoral Road 12/7/21 12:10 12/7/21 dB (Lin Peak) 95.7 120 115 No
7 BP04 South Muswellbrook 12/16/21 14:38 12/16/21 dB (Lin Peak) 88.5 120 115 No
8 BP07 Sheppard Avenue 12/16/21 14:38 12/16/21 dB (Lin Peak) 96.5 120 115 No
9 BP09 Denman Road West 12/16/21 14:38 12/16/21 dB (Lin Peak) 98.8 120 115 No
10 BP11 Balmoral Road 12/16/21 14:38 12/16/21 dB (Lin Peak) 88.2 120 115 No
7 BP04 South Muswellbrook 12/16/21 14:43 12/16/21 dB (Lin Peak) 85.8 120 115 No
8 BP07 Sheppard Avenue 12/16/21 14:43 12/16/21 dB (Lin Peak) 86 120 115 No
9 BP09 Denman Road West 12/16/21 14:43 12/16/21 dB (Lin Peak) 93.7 120 115 No
10 BP11 Balmoral Road 12/16/21 14:43 12/16/21 dB (Lin Peak) 82.8 120 115 No
7 BP04 South Muswellbrook 12/20/21 16:29 12/20/21 dB (Lin Peak) 90.6 120 115 No
8 BP07 Sheppard Avenue 12/20/21 16:29 12/20/21 dB (Lin Peak) 92.9 120 115 No
9 BP09 Denman Road West 12/20/21 16:29 12/20/21 dB (Lin Peak) 84.1 120 115 No
10 BP11 Balmoral Road 12/20/21 16:29 12/20/21 dB (Lin Peak) 90.9 120 115 No
7 BP04 South Muswellbrook 12/22/21 15:33 12/22/21 dB (Lin Peak) 90.1 120 115 No
8 BP07 Sheppard Avenue 12/22/21 15:33 12/22/21 dB (Lin Peak) 95.3 120 115 No
9 BP09 Denman Road West 12/22/21 15:33 12/22/21 dB (Lin Peak) 102.2 120 115 No
10 BP11 Balmoral Road 12/22/21 15:33 12/22/21 dB (Lin Peak) 91.4 120 115 No
7 BP04 South Muswellbrook 12/22/21 15:34 12/22/21 dB (Lin Peak) 91.7 120 115 No
8 BP07 Sheppard Avenue 12/22/21 15:34 12/22/21 dB (Lin Peak) 98.9 120 115 No
9 BP09 Denman Road West 12/22/21 15:34 12/22/21 dB (Lin Peak) 104.2 120 115 No
10 BP11 Balmoral Road 12/22/21 15:34 12/22/21 dB (Lin Peak) 87.7 120 115 No
7 BP04 South Muswellbrook 12/30/21 14:32 12/30/21 dB (Lin Peak) 89.1 120 115 No
8 BP07 Sheppard Avenue 12/30/21 14:32 12/30/21 dB (Lin Peak) 98.5 120 115 No
9 BP09 Denman Road West 12/30/21 14:32 12/30/21 dB (Lin Peak) 96.3 120 115 No
10 BP11 Balmoral Road 12/30/21 14:32 12/30/21 dB (Lin Peak) 96.5 120 115 No
7 BP04 South Muswellbrook 12/30/21 14:31 12/30/21 dB (Lin Peak) 87.4 120 115 No
8 BP07 Sheppard Avenue 12/30/21 14:31 12/30/21 dB (Lin Peak) 104.2 120 115 No
9 BP09 Denman Road West 12/30/21 14:31 12/30/21 dB (Lin Peak) 112.1 120 115 No
10 BP11 Balmoral Road 12/30/21 14:31 12/30/21 dB (Lin Peak) 94.4 120 115 No
Table 2: Blasting results for the 2020-2021 reporting period
Location Percentile value over 115 dB (Lin Peak) Percentile limit for reporting period Exceedance (yes/no) Observations Value over 120dBL Percentile limit for reporting period Exceedance (yes/no) Observations
BP04 0.0% 5% No 0 0% No
BP07 1.5% 5% No 0 0% No
BP09 1.5% 5% No 0 0% No
BP11 0.0% 5% No 0 0% No
This monitoring data is provided at the close of the reporting period which will next occur in August 2022.

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Blasting (Vibration)
Back to Main Menu
Blast Monitoring Data (Overpressure)
Locations of Blast Monitoring Stations
Published date 1/20/22
Blasting Monitoring Data (Vibration)
Information related to blasting limits and conditions
The 100 percentile limit is defined as an absolute measured limit which must be met all times.
The 95 percentile limit means that monitoring results must not exceed the specified limit for 95% of the reporting period.
The reporting period is defined as the period of 12 months after the issue of the licence, and each subsequent period of 12 months. The reporting period for EPL 11457 is currently 31 August 2018 to 30 August 2019.
The ground vibration peak particle velocity from blasting operations carried out in or on the premises must not exceed:
a) 5 mm/s for more than 5% of the total number of blasts carried out on the premises during each reporting period (Table 2);
b) 10 mm/s at any time.
Table 1: Blasting results for the month
EPA identification no. Sample point Reference point Time/date of blast Date obtained Unit of measure Measured value 100 percentile limit 95 percentile limit Exceedance (yes/no) Observations
7 BP04 South Muswellbrook 12/4/21 13:31 12/4/21 mm/s 0.07 10 5 No
8 BP07 Sheppard Avenue 12/4/21 13:31 12/4/21 mm/s 0.11 10 5 No
9 BP09 Denman Road West 12/4/21 13:31 12/4/21 mm/s 1.09 10 5 No
10 BP11 Balmoral Road 12/4/21 13:31 12/4/21 mm/s 0.03 10 5 No
7 BP04 South Muswellbrook 12/4/21 13:31 12/4/21 mm/s 0.06 10 5 No
8 BP07 Sheppard Avenue 12/4/21 13:31 12/4/21 mm/s 0.11 10 5 No
9 BP09 Denman Road West 12/4/21 13:31 12/4/21 mm/s 1.09 10 5 No
10 BP11 Balmoral Road 12/4/21 13:31 12/4/21 mm/s 0.03 10 5 No
7 BP04 South Muswellbrook 12/7/21 13:31 12/7/21 mm/s 0.07 10 5 No
8 BP07 Sheppard Avenue 12/7/21 13:31 12/7/21 mm/s 0.04 10 5 No
9 BP09 Denman Road West 12/7/21 13:31 12/7/21 mm/s 1.31 10 5 No
10 BP11 Balmoral Road 12/7/21 13:31 12/7/21 mm/s 0.01 10 5 No
7 BP04 South Muswellbrook 12/7/21 12:10 12/7/21 mm/s 0.07 10 5 No
8 BP07 Sheppard Avenue 12/7/21 12:10 12/7/21 mm/s 0.06 10 5 No
9 BP09 Denman Road West 12/7/21 12:10 12/7/21 mm/s 0.07 10 5 No
10 BP11 Balmoral Road 12/7/21 12:10 12/7/21 mm/s 0.04 10 5 No
7 BP04 South Muswellbrook 12/16/21 14:38 12/16/21 mm/s 0.07 10 5 No
8 BP07 Sheppard Avenue 12/16/21 14:38 12/16/21 mm/s 0.10 10 5 No
9 BP09 Denman Road West 12/16/21 14:38 12/16/21 mm/s 1.11 10 5 No
10 BP11 Balmoral Road 12/16/21 14:38 12/16/21 mm/s 0.05 10 5 No
7 BP04 South Muswellbrook 12/16/21 14:43 12/16/21 mm/s 0.09 10 5 No
8 BP07 Sheppard Avenue 12/16/21 14:43 12/16/21 mm/s 0.09 10 5 No
9 BP09 Denman Road West 12/16/21 14:43 12/16/21 mm/s 0.14 10 5 No
10 BP11 Balmoral Road 12/16/21 14:43 12/16/21 mm/s 0.02 10 5 No
7 BP04 South Muswellbrook 12/20/21 16:29 12/20/21 mm/s 0.17 10 5 No
8 BP07 Sheppard Avenue 12/20/21 16:29 12/20/21 mm/s 0.14 10 5 No
9 BP09 Denman Road West 12/20/21 16:29 12/20/21 mm/s 0.19 10 5 No
10 BP11 Balmoral Road 12/20/21 16:29 12/20/21 mm/s 0.10 10 5 No
7 BP04 South Muswellbrook 12/22/21 15:33 12/22/21 mm/s 0.04 10 5 No
8 BP07 Sheppard Avenue 12/22/21 15:33 12/22/21 mm/s 0.13 10 5 No
9 BP09 Denman Road West 12/22/21 15:33 12/22/21 mm/s 0.29 10 5 No
10 BP11 Balmoral Road 12/22/21 15:33 12/22/21 mm/s 0.01 10 5 No
7 BP04 South Muswellbrook 12/22/21 15:34 12/22/21 mm/s 0.09 10 5 No
8 BP07 Sheppard Avenue 12/22/21 15:34 12/22/21 mm/s 0.27 10 5 No
9 BP09 Denman Road West 12/22/21 15:34 12/22/21 mm/s 0.79 10 5 No
10 BP11 Balmoral Road 12/22/21 15:34 12/22/21 mm/s 0.03 10 5 No
7 BP04 South Muswellbrook 12/30/21 14:32 12/30/21 mm/s 0.04 10 5 No
8 BP07 Sheppard Avenue 12/30/21 14:32 12/30/21 mm/s 0.03 10 5 No
9 BP09 Denman Road West 12/30/21 14:32 12/30/21 mm/s 0.31 10 5 No
10 BP11 Balmoral Road 12/30/21 14:32 12/30/21 mm/s 0.02 10 5 No
7 BP04 South Muswellbrook 12/30/21 14:31 12/30/21 mm/s 0.09 10 5 No
8 BP07 Sheppard Avenue 12/30/21 14:31 12/30/21 mm/s 0.09 10 5 No
9 BP09 Denman Road West 12/30/21 14:31 12/30/21 mm/s 0.57 10 5 No
10 BP11 Balmoral Road 12/30/21 14:31 12/30/21 mm/s 0.03 10 5 No
Table 2: Blasting results for the 2020 - 2021 reporting period
Location Percentile value over 5mm/s Percentile limit for reporting period Exceedance (yes/no) Observations Value over 10mm/s Percentile limit for reporting period Exceedance (yes/no) Observations
BP04 0.0% 5% No 0 0% No
BP07 0.0% 5% No 0 0% No
BP09 2.5% 5% No 1 0% Yes Exceedance of 10mm/s criteria reported to DPIE and EPA investigation undertaken. 10mm/s was not exceeded at the nearest privatly owned residence
BP11 0.0% 5% No 0 0% No
The monitoring data will be provided at the close of the reporting period which will occur in August 2022.

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Correction Log
Back to Main Menu
Published date 1/20/22
Correction Log
Monitoring type Sampling point Reference Date Original data Corrected data Date corrected Date originally published Comments

Licensee: HUNTER VALLEY ENERGY COAL PTY LTD Premises: Mt Arthur Coal, Thomas Mitchell Drive, Muswellbrook, NSW, 2333 EPL 11457

Attachments

  • Original Link
  • Original Document
  • Permalink