AS TALLINNA SADAM

TSM1T
Delayed Quote. Delayed  - 08/10 08:59:33 am
1.46EUR +3.84%

Tallinna Sadam to Build New Quay in Paldiski South Harbour to Service Wind Farms

06/20/2022 | 09:12am
AS Tallinna Sadam supervisory board decided to invest up to EUR 53 million to build a new 310-meter quay with a 10-hectare area beyond the quay in Paldiski South Harbour. The investment is co-financed by European Commission in the amount of EUR 20 million through the military mobility project EstMilMob, which aims to improve transport connections to Tapa over the next five years. The quay and hinterland area will be completed in summer 2025. The new quay with the beyond area to be built in Paldiski South Harbour is necessary not only for military purposes but also to increase the maritime transport capacity of goods and vehicles. Due to the favorable location of Paldiski South Harbour, the construction of the new quay will create preconditions for Tallinna Sadam to become an important partner in the construction and subsequent maintenance of offshore wind farms in the Baltic Sea region. The new quay will ensure the capacity of the port to receive high-draft special-purpose vessels for the construction of offshore wind farms and the transport of wind turbine components. The large rear area beyond the quay allows various preparations for the manufacture and storage of generators and wind turbine blades before being loaded on a ship. In addition, the new quay can be used to service ro-ro vessels if required.
© S&P Capital IQ 2022
Copier lien
All news about AS TALLINNA SADAM
15h ago
16h ago
16h ago
21h ago
21h ago