06.06.2020

Dear Partners,

Please be advised that the auctions regarding the bundled/unbundled capacities offered at the interconnections points:

  • Csanádpalota RO>HU (EIC code: 21Z000000000236Q, GMOIS code: SM1281D0) and

  • Csanádpalota HU>RO (EIC code: 21Z000000000236Q, GMOIS code: PM0266)

for the firm yearly bundled/unbundled capacity, for the forthcoming 5 gas years, starting with 2020/2021 have been registered at the Regional Booking Platform (RBP).

The auction publications regarding the offered capacities are available on theRBP Portal.

Network Users shall be entitled to participate in the auction, if, till 10:00 (UTC), Friday, 19 June 2020:

A. has completed the registration at the RBP application.

The registration is accepted if the applicant:

  • 1) has filled in the'Network User Registration Form',has duly signed and has sent the scanned version to the e-mail addressrbp@fgsz.hu, and has sent two original copies to FGSZ Ltd. (H-8600 Siófok, Tanácsház u. 5.), as well as

  • 2) has filled in and duly signed theNetwork user membership agreement for the usage of theregional booking platform - has sent the scanned version to the e-mail addressrbp@fgsz.hu and has sent two originals to FGSZ Ltd. (H-8600 Siófok, Tanácsház u. 5.). In addition the applicant must send the list of persons who are entitled to represent the applicant company. A valid digital certificate issued by a trusted provider must be registered for each RBP user, which must be submitted within the 'Network User Registration Form'.

and if, till 10:00 (UTC), Tuesday, 30 June 2020:

B. has fulfilled the registration conditions mentioned in theANRE Order no. 88/22.11.2016 onmeasures for transmission capacity booking at the interconnection points between theRomanian Gas Transmission System and the Gas Transmission Systems of EU Member Statesneighboring Romania

C.

has submitted the auction security.

The opening time of the auctions for the bundled/unbundled capacity shall start on 06.07.2020 at 07.00 (UTC), which shall mean 09.00 o'clock in Hungary (CET) and 10.00 o'clock in Romania (EET). In an auction the Network Users may submit bids for the required capacity in subsequent auction rounds applying pre-determined price steps (ascending clock auction). With regard to the auction process, further information can be found in the"Operational Rules of the Regional Booking Platform (PRRC)" and in the'User Manual for the Bidder Role'.

Network Users with a winning bid in the auction are obliged to pay the capacity fee related to the obtained capacity, the eventual auction premium calculated on the basis of the underlying price step and if applicable, the volumetric fee for the transmitted gas quantities.

After the capacity auction is closed, the allocated capacities will be registered in the Contract module of Transgaz' informatics platform (GMOIS).

Detailed information with regard to usage of the allocated capacities in the interconnection points are available atInterconnection procedures.

Should you have any questions regarding the auctions, please do not hesitate to contact us atrbp@fgsz.hu or rbp@transgaz.ro.

Yours sincerely,

SNTGN Transgaz SA